Project details
| Official title | Forest Land Proposed for Channelization Work by Dredging for Protection From Erosion Taking Place Near the Rahul Nagar Ambechandiya Hazara Village on the Right Bank of Sharda River, in District- Pilibhit |
|---|---|
| Status | Lapsed |
| Status since | 18 Jul 2024 |
| Application filed | 23 Mar 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Barrage Mechanical Maintenance Division Varanasi Up Irrigation Department |
| Land area | 43.6 acres (17.7 ha) |
| Forest land | 43.6 acres (17.7 ha) |
| Project cost | ₹9.3 crore |
| Village / locality | Chandiya Hazara |
| Taluk / tehsil | Puranpur |
| District | Pilibhit |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-07123 |
In context
5 applications in Pilibhit since January 2022 are in the same category (Buildings & townships): 2 approved, 2 filed or under review, and 1 withdrawn, lapsed or rejected.
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Chandiya Hazara, Puranpur, Pilibhit, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Forest Land to Be Diverted for Construction of Sharda River Bridge,… — more information requested, 3.2 km away
- Proposed Forest Land to Be Diverted for Construction of Sharda River Bridge,… — more information requested, 3.2 km away
- Proposed Forest Land to Be Diverted for Construction of Sharda River Bridge,… — under wildlife review, 3.2 km away
- "Ordinary Earth Mine", Village- Ramnagar, Gata No.- 54, 55, 122, 226, 246, 247… — environmental approval granted, 12.3 km away
- "Ordinary Earth Mine" — initial checks, 13.8 km away
- Kheri Naubaramad Soil Mining Project — environmental approval granted, 15.1 km away
- Tulsipur Soil Mining Project — under environmental review, 15.2 km away
- Takia Dinarpur Soil Mining Projec — under environmental review, 20.4 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.