One of 3 filings for this project. The project's main page, with every filing and where each stands: Proposed Forest Land to Be Diverted for Construction of Sharda River Bridge, Approach…
Project details
| Official title | Proposed Forest Land to Be Diverted for Construction of Sharda River Bridge, Approach Road, Additional Approach Road and Protective Work in District:- Pilibhit. |
|---|---|
| Status | More information requested |
| Status since | 3 May 2024 |
| Application filed | 3 May 2024 |
| Approval sought | Wildlife review |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Up State Bridge Corporation Limited |
| Land area | 14.8 acres (6 ha) |
| Project cost | ₹269.1 crore |
| Village / locality | Chandiya Hazara |
| Taluk / tehsil | Puranpur |
| District | Pilibhit |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-07349 |
All filings for this project
This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 1 Sept 2024 | More information requested | 14.8 acres | ₹269.1 crore |
| New project filed 28 Jun 2024 | Under wildlife review | 2.4 acres | ₹269.1 crore |
| New project filed 3 May 2024 (this page) | More information requested | 14.8 acres | ₹269.1 crore |
In context
10 applications in Pilibhit since January 2022 are in the same category (Roads & highways): 2 approved, 5 filed or under review, and 3 withdrawn, lapsed or rejected.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Chandiya Hazara, Puranpur, Pilibhit, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Forest Land to Be Diverted for Construction of Sharda River Bridge,… — more information requested, 0 m away
- Proposed Forest Land to Be Diverted for Construction of Sharda River Bridge,… — under wildlife review, 2.2 km away
- Forest Land Proposed for Channelization Work by Dredging for Protection From… — lapsed, 3.2 km away
- "Ordinary Earth Mine", Village- Ramnagar, Gata No.- 54, 55, 122, 226, 246, 247… — environmental approval granted, 12.5 km away
- Kheri Naubaramad Soil Mining Project — environmental approval granted, 13 km away
- Tulsipur Soil Mining Project — under environmental review, 13.4 km away
- "Ordinary Earth Mine" — initial checks, 14 km away
- Forest Land Proposed to be diverted for construction of Road from Sashasra… — lapsed, 18.2 km away
3 Up State Bridge Corporation projects in Pilibhit
All 17 Up State Bridge Corporation projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.