Quick answers
What is this project?
Proposed Protected Forest Land to Be Diverted for Construction of 02 Lane Rail Over Bridge on Railway Link No. 386 C in Front of Mandi Samiti in the Middle of Milak Patwai Road Under Tehsil Milak District Rampur (Up) is a proposed road project in Milak Asadaulpur, Milak, Rampur, Uttar Pradesh. The site covers 3.6 acres.
Who is building it?
The applicant is Uttar Pradesh State Bridge Corporation Limited.
Has it been approved?
Not yet. The application is still under review: its status is “Under forest review”, as of 27 Nov 2026.
Where is it?
In Milak Asadaulpur, Milak, Rampur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹108 crore; a site of 3.6 acres and 570 m² of forest land.
When was it filed?
The application was filed on 3 Jun 2026.
Project details
| Status | Under forest review |
|---|---|
| Status since | 16 Nov 2026 |
| Application filed | 3 Jun 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Uttar Pradesh State Bridge Corporation Limited |
| Land area | 3.6 acres (1.5 ha) |
| Forest land | 570 m² |
| Project cost | ₹108 crore |
| Village / locality | Milak Asadaulpur |
| Taluk / tehsil | Milak |
| District | Rampur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-07142 |
In context
9 applications in Rampur since January 2022 are in the same category (Roads & highways): 1 approved, 4 filed or under review, and 4 withdrawn, lapsed or rejected.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Milak Asadaulpur, Milak, Rampur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- New Retail Outlet of Hpcl, Forest Land Is Required to Be Diverted As Per Fca… — lapsed, 2.7 km away
- Protected Forest Land to be Diverted for Entry/Exit approach to IOCL Retail… — forest land use approved, 2.8 km away
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach to BPCL… — forest land use approved, 5.9 km away
- Proposed Protected Forest Land Construction Widening/Upgradation of road by… — lapsed, 7.3 km away
- Proposed Protected Forest Land Construction Widening/Upgradation of road by… — lapsed, 7.3 km away
- Protected Forest Land proposed for diversion for Entry/Exit approach to Indian… — lapsed, 7.6 km away
- Bharti Airtel Limited, Project for Laying of Optical Fiber Cable (OFC) — more information requested, 11.2 km away
- Diversion of forest land for Jio Digital Fibre Private Limited Project for… — lapsed, 13.8 km away
All 3 Uttar Pradesh State Bridge Corporation projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.