Quick answers
What is this project?
New Retail Outlet of Hpcl, Forest Land Is Required to Be Diverted As Per Fca 1980 for Non Forestry Purpose, Abutting on Rampur - Bareilly Road, NH-530 (Old NH-24) in Between Km 204 - 205, Km Chainage From 204.801 to 204.836, Rhs, Khasra No. 386/1, Village Nagaria Tehsil Milak District Rampur, Uttar Pradesh by HPCL is a lapsed fuel station in Loha Patti Bhagirath, Milak, Rampur, Uttar Pradesh. The site covers 0.7 acres.
Who is building it?
The applicant is Hindustan Petroleum Corporation Limited (HPCL).
Has it been approved?
No. The application was lapsed on 17 Apr 2025, so it is no longer under consideration.
Where is it?
In Loha Patti Bhagirath, Milak, Rampur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹75 lakh; a site of 0.7 acres and 1,280 m² of forest land.
When was it filed?
The application was filed on 20 Jun 2023.
Project details
| Official title | Construction of New Retail Outlet of Hpcl, Forest Land Is Required to Be Diverted As Per Fca 1980 for Non Forestry Purpose, Abutting on Rampur - Bareilly Road, NH-530 (Old NH-24) in Between Km 204 - 205, Km Chainage From 204.801 to 204.836, Rhs, Khasra No. 386/1, Village Nagaria Tehsil Milak District Rampur, Uttar Pradesh |
|---|---|
| Status | Lapsed |
| Status since | 17 Apr 2025 |
| Application filed | 20 Jun 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Fuel stations |
| Applicant | Hindustan Petroleum Corporation Limited (HPCL) |
| Land area | 2,900 m² |
| Forest land | 1,280 m² |
| Project cost | ₹75 lakh |
| Village / locality | Loha Patti Bhagirath |
| Taluk / tehsil | Milak |
| District | Rampur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-05225 |
In context
30 applications in Rampur since January 2022 are in the same category (Fuel stations): 21 approved, 4 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 9 months from filing to approval. At 0.7 acres, this one is smaller than 67% of them.
5 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Loha Patti Bhagirath, Milak, Rampur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Protected Forest Land to be Diverted for Entry/Exit approach to IOCL Retail… — forest land use approved, 2.1 km away
- Proposed Protected Forest Land to Be Diverted for Construction of 02 Lane Rail… — under forest review, 2.7 km away
- Proposed Protected Forest Land Construction Widening/Upgradation of road by… — lapsed, 4.8 km away
- Proposed Protected Forest Land Construction Widening/Upgradation of road by… — lapsed, 4.8 km away
- Protected Forest Land proposed for diversion for Entry/Exit approach to Indian… — lapsed, 5 km away
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach to BPCL… — forest land use approved, 5.1 km away
- Bharti Airtel Limited, Project for Laying of Optical Fiber Cable (OFC) — more information requested, 10.9 km away
- Proposed Protected Forest Land to be diverted for Entry/Exit approach to IOCL… — forest land use approved, 11.3 km away
More from Hindustan Petroleum Corporation Limited (HPCL) in Rampur
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach to HPCL… — forest land use approved
- Proposed Forest Land to be Diverted for Entry/Exit approach to HPCL Retail… — forest land use approved
- Proposed Forest Land to be Diverted for Entry/Exit approach to HPCL Retail… — forest land use approved
- New Retail Outlet of Hpcl, Forest Land Is Required to Be Diverted As Per Fca… — forest land use approved
- Proposed Protected Forest Land to be diverted for Laying of Gas Pipe Line… — lapsed
8 Hindustan Petroleum Corporation (HPCL) projects in Rampur
All 508 Hindustan Petroleum Corporation (HPCL) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.