Project details
| Status | Application filed |
|---|---|
| Status since | 25 Oct 2026 |
| Approval sought | Wildlife review |
| Application type | New project |
| Sector | Other |
| Applicant | Mahesh Nair |
| Land area | 2.4 acres (1 ha) |
| Project cost | ₹1.3 crore |
| Village / locality | Sarda Sagar |
| Taluk / tehsil | Puranpur |
| District | Pilibhit |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-07266 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Change of use filed 26 Dec 2022 | Lapsed | 2.4 acres | ₹1.3 crore |
| New project (this page) | Application filed | 2.4 acres | ₹1.3 crore |
In context
9 applications in Pilibhit since January 2022 are in the same category (Other): 0 approved, 6 filed or under review, and 3 withdrawn, lapsed or rejected.
7 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Sarda Sagar, Puranpur, Pilibhit, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- 4G Saturation Project — lapsed, 0 m away
- Project for Laying of Proposed Underground Optical Fiber Cable (OFC) — under forest review, 350 m away
- Project for Laying of Optical Fiber Cable (OFC) — more information requested, 350 m away
- Project for Laying of Optical Fiber Cable (OFC) — lapsed, 350 m away
- Project for Laying of Optical Fiber Cable (OFC) — application filed, 350 m away
- Project for Laying of Proposed Underground Optical Fiber Cable (OFC) — under wildlife review, 350 m away
- Rediversion of Forest Land for Installation of 4G BSNL Mobile Towers under… — in-principle approval, conditions pending, 4.7 km away
- Rediversion of Forest Land for Installation of 4G BSNL Mobile Towers under… — under wildlife review, 4.7 km away
More from Mahesh Nair in Pilibhit
- Rediversion of Forest Land for Installation of 4G BSNL Mobile Towers under… — in-principle approval, conditions pending
- Rediversion of Forest Land for Installation of 4G BSNL Mobile Towers under… — under wildlife review
- 4G Saturation Project — lapsed
- 4G Saturation Project — lapsed
- 4G Saturation Project — application filed
- 4G Saturation Project — application filed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.