Quick answers
What is this project?
Proposed Forest Land to Be Diverted for Laying of Optical Fiber Cable Line is a proposed telecom project in Badauhi, Lalganj, Mirzapur, Uttar Pradesh. The site covers 3.5 acres.
Who is building it?
The applicant is Bharti Airtel Limited.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Badauhi, Lalganj, Mirzapur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹66 lakh and a site of 3.5 acres.
When was it filed?
The application was filed on 29 Aug 2024.
Project details
| Official title | Proposed Forest Land to Be Diverted for Laying of Optical Fiber Cable Line in District-Mirzapur. |
|---|---|
| Status | More information requested |
| Status since | 29 Aug 2024 |
| Application filed | 29 Aug 2024 |
| Approval sought | Wildlife review |
| Application type | New project |
| Sector | Telecom |
| Applicant | Bharti Airtel Limited |
| Land area | 3.5 acres (1.4 ha) |
| Project cost | ₹66 lakh |
| Village / locality | Badauhi |
| Taluk / tehsil | Lalganj |
| District | Mirzapur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-07346 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 29 Aug 2024 (this page) | More information requested | 3.5 acres | ₹66 lakh |
| New project filed 29 Aug 2024 | Lapsed | 3.5 acres | ₹66 lakh |
In context
7 applications in Mirzapur since January 2022 are in the same category (Telecom): 0 approved, 1 filed or under review, and 6 withdrawn, lapsed or rejected.
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Badauhi, Lalganj, Mirzapur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Forest Land to Be Diverted for Laying of Optical Fiber Cable Line — lapsed, 0 m away
- Proposed forest land to be diverted for Laying of Optical Fiber Cable Line… — more information requested, 0 m away
- Proposed Reserved Forest Land to be diverted for Laying of Underground… — more information requested, 3.9 km away
- Proposed Reserved Forest Land to be diverted for Laying of Underground… — decision issued, 3.9 km away
- Proposed forest land to be diverted for Laying of Optical Fiber Cable Line… — lapsed, 6.1 km away
- Bharat Net — lapsed, 10.7 km away
- Proposed project of Building Stone Sand Stone Quartizite Ballast… — environmental approval granted, 17.6 km away
- Expansion of Existing 200 Klpd Grain Based Distillery Unit to 400klpd… — returned to applicant, 20.4 km away