Quick answers
What is this project?
Expansion of Existing 200 Klpd Grain Based Distillery Unit to 400klpd Ditillery Unit & Bottling Plant is a proposed industrial project in Simaria, Lalganj, Mirzapur, Uttar Pradesh. The site covers 27.5 acres.
Who is building it?
The applicant is Devesh Giri.
Has it been approved?
Not yet. The application is still under review: its status is “Returned to applicant”, as of 27 Nov 2026.
Where is it?
In Simaria, Lalganj, Mirzapur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹444.1 crore and a site of 27.5 acres.
When was it filed?
The application was filed on 31 Jul 2026.
Project details
| Status | Returned to applicant |
|---|---|
| Status since | 31 Aug 2026 |
| Application filed | 31 Jul 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Devesh Giri |
| Land area | 27.5 acres (11.1 ha) |
| Project cost | ₹444.1 crore |
| Village / locality | Simaria |
| Taluk / tehsil | Lalganj |
| District | Mirzapur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-04618 |
In context
16 applications in Mirzapur since January 2022 are in the same category (Industry): 9 approved, 5 filed or under review, and 2 withdrawn, lapsed or rejected. At 27.5 acres, this one is larger than 63% of them.
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Simaria, Lalganj, Mirzapur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion of existing 200 KLPD Grain Based Distillery Unit to 300 KLPD Ethanol… — returned to applicant, 0 m away
- Expansion of Existing 200 Klpd Grain Based Distillery Unit to 400klpd… — lapsed, 0 m away
- Proposed project of Building Stone Sand Stone Quartizite Ballast… — environmental approval granted, 3.7 km away
- Proposed Stand-alone Grinding Unit with Cement Production Capacity of 5.0… — environmental approval granted, 5.7 km away
- Bharat Net — lapsed, 9.7 km away
- Kalu Patti Pumped Storage Project — cleared for impact study, 11.9 km away
- Kalu Patti PSP (1000 MW) — under environmental review, 12.3 km away
- Kalu Patti Pumped Storage Project (1000 MW) — lapsed, 12.3 km away
More from Devesh Giri in Mirzapur
- Expansion of existing 200 KLPD Grain Based Distillery Unit to 300 KLPD Ethanol… — returned to applicant
- Expansion of Existing 200 Klpd Grain Based Distillery Unit to 400klpd… — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.