One of 2 filings for this project. The project's main page, with every filing and where each stands: Kakra Kakar Kund Sand Mining Project
Project details
| Status | Initial checks |
|---|---|
| Status since | 29 Oct 2026 |
| Application filed | 29 Oct 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Sunil Kumar Singh |
| Land area | 26.5 acres (10.7 ha) |
| Project cost | ₹85 lakh |
| Village / locality | Kakra Kankarkund |
| Taluk / tehsil | Shahjahanpur |
| District | Shahjahanpur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-07463 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 29 Oct 2026 (this page) | Initial checks | 26.5 acres | ₹85 lakh |
| Early planning filed 26 May 2026 | Under environmental review | 26.5 acres | ₹85 lakh |
In context
31 applications in Shahjahanpur since January 2022 are in the same category (Mining): 23 approved, 7 filed or under review, and 1 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 26.5 acres, this one is larger than 94% of them.
No other mining lease on record is within 500 m of this site; 1 has applied within 5 km.
Where it is
Kakra Kankarkund, Shahjahanpur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Kakra Kakar Kund Sand Mining Project — under environmental review, 0 m away
- Bhedpur Soil Mining Project — environmental approval granted, 2 km away
- Proposed manufacturing unit of Formaldehyde (400 TPD) Urea Formaldehyde Resin… — environmental approval granted, 2.2 km away
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach to IOCL… — lapsed, 2.5 km away
- Bharat Net — lapsed, 4 km away
- Proposed Forest Land to be Diverted for Entry/Exit Approach to Reliance BP… — in-principle approval, conditions pending, 4.1 km away
- Proposed Forest Land to be Diverted for Entry/Exit Approach to Nayara Energy… — lapsed, 4.8 km away
- CGD Network GA-11A.01 — forest land use approved, 5.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.