Project details
| Official title | Proposed Forest Land to be Diverted for Entry/Exit Approach to Nayara Energy Limited Retail Outlet at Village: - Nawada Indepur, Tehsil:- Sadar, District:- Shahjahanpur (Uttar Pradesh). |
|---|---|
| Status | Lapsed |
| Status since | 11 Jul 2026 |
| Application filed | 11 May 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Fuel stations |
| Applicant | M/S Nayara Energy Limited |
| Land area | 1.1 acres (0.4 ha) |
| Forest land | 2,390 m² |
| Project cost | ₹65 lakh |
| Village / locality | Nawada Indepur |
| Taluk / tehsil | Shahjahanpur |
| District | Shahjahanpur |
| State | Uttar Pradesh |
| Location from | Site area on record |
| Our reference | WID-UP-07204 |
In context
23 applications in Shahjahanpur since January 2022 are in the same category (Fuel stations): 10 approved, 9 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 11 months from filing to approval. At 1.1 acres, this one is larger than 78% of them.
12 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Nawada Indepur, Shahjahanpur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Cane Juice Syrup/B Or C Heavy Molasses/ Grain Based Distillery Having… — environmental approval granted, 1.5 km away
- Proposed Cane Juice Syrup/B Or C Heavy Molasses/ Grain Based Distillery Having… — cleared for impact study, 1.5 km away
- Expansion of existing Sugar unit from 4500 TCD to 6500 TCD and expansion in co… — environmental approval granted, 1.9 km away
- Expansion of existing Sugar unit from 4500 TCD to 6500 TCD and expansion in co… — cleared for impact study, 1.9 km away
- Proposed Forest Land to be Diverted for Entry/Exit Approach to Reliance BP… — in-principle approval, conditions pending, 3.1 km away
- Laying of 12" Carbon Steel Gas Pipeline Along the Road by Bpcl on SH-29… — forest land use approved, 3.5 km away
- Laying of 12" Carbon steel Gas Pipeline along the road by BPCL on… — lapsed, 3.6 km away
- Nusratpur Soil Mining Project — environmental approval granted, 4 km away
All 61 Nayara Energy projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.