Project details
| Official title | Proposal for Diversion of Pf Land in Favour of M/S Rose Wood Farms, Muzaffarnagar for Entry/Exit Approach to Proposed Hotel on Panipat-Khatima Road (SH-12) in Between Km 102 to 103, at Right Side Towards Biharigarh Village, at Khasra No. 285 & 285m, at Village-Ilhabas, Tehsil Jansath & District - Muzaffarnagar, Uttar Pradesh. |
|---|---|
| Status | Initial checks |
| Status since | 16 Nov 2026 |
| Application filed | 16 Nov 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Rose Wood Farms |
| Land area | 3.8 acres (1.5 ha) |
| Forest land | 430 m² |
| Project cost | ₹7.3 crore |
| Village / locality | Ilabas |
| Taluk / tehsil | Jansath |
| District | Muzaffarnagar |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-07550 |
In context
26 applications in Muzaffarnagar since January 2022 are in the same category (Buildings & townships): 9 approved, 16 filed or under review, and 1 withdrawn, lapsed or rejected. The approved ones took a median of 9 months from filing to approval. At 3.8 acres, this one is larger than 58% of them.
4 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Ilabas, Jansath, Muzaffarnagar, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- NOC/Wildlife Clearance of Proposed Forest Land (under the Forest… — under wildlife review, 0 m away
- Project for Wildlife Clearence in Sbwl/Nbwl :- Proposed Non Forest Land in… — under wildlife review, 2 km away
- NOC/Wildlife Clearance of Proposed Reserve Forest Land in State Animal… — under wildlife review, 2 km away
- Project for Wildlife Clearence in Sbwl/Nbwl :-Construction of Solani River… — under wildlife review, 2.7 km away
- Proposed Non Forest Land in State Animal Barasingha Sanctuary (Old Name… — under wildlife review, 7.4 km away
- Amended Bharatnet Project — lapsed, 7.8 km away
- Project for Wildlife Clearence in Sbwl/Nbwl :-Construction of Overhead Water… — more information requested, 9.8 km away
- 0.07869 Ha PF land Proposed to Transfer for approach and exit road for… — lapsed, 10.8 km away
More from Rose Wood Farms in Muzaffarnagar
- NOC/Wildlife Clearance of Proposed Forest Land (under the Forest… — under wildlife review
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.