Project details
| Official title | Project for Wildlife Clearence in Sbwl/Nbwl :-Construction of Overhead Water Tanks and Comprising of Tube Well Pressure Mains, Ohsr, Distribution Pipe Networks in Village - Majlishpur ,kharpaur-Dhariwala Jadid-Mirawala ,bhuapur ,kadi-Dariyapur ,shukartari-Bhuapur (Block-Morna ,tehsil -Jansath), Sikhrera-Jamalpur, Siali-Alampur-Mahmoodpur Moonger ,raharwa-Raharwa Qadim-Lalpur Aht,jalalpur Neela-Butrari-Majahidpur Aht-Nayagaon,ramraj Urf Samana- Jamalpur Khader,putthi Ibrahimpur-Tikaula ,husainp |
|---|---|
| Status | More information requested |
| Status since | 25 Sept 2024 |
| Application filed | 25 Sept 2024 |
| Approval sought | Wildlife review |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Jal Jeeavn Uttar Pradesh |
| Land area | 4.4 acres (1.8 ha) |
| Project cost | ₹50.7 crore |
| Village / locality | Ahmadeala |
| Taluk / tehsil | Jansath |
| District | Muzaffarnagar |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-07335 |
In context
26 applications in Muzaffarnagar since January 2022 are in the same category (Buildings & townships): 9 approved, 16 filed or under review, and 1 withdrawn, lapsed or rejected. The approved ones took a median of 9 months from filing to approval. At 4.4 acres, this one is larger than 69% of them.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Ahmadeala, Jansath, Muzaffarnagar, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- NOC/Wildlife Clearance of Proposed Private Land (under the Wildlife… — under wildlife review, 2 km away
- Proposed Non Forest Land in State Animal Barasingha Sanctuary (Old Name… — under wildlife review, 3.7 km away
- BSNL OFC Laying by HDD Method from Km. Ch. 59.000 to 67.800 & Km. Ch. 70.200… — lapsed, 5.9 km away
- Proposed Forest Land to Be Diverted for Laying of O.F.C to B.S.N.L Moradabad… — more information requested, 5.9 km away
- NOC Wildlife Clearance Of Proposed Non-Forest Land (Private Land) In State… — under wildlife review, 5.9 km away
- Proposed forest land to be diverted for Entry/Exit approach to Nayara Energy… — under wildlife review, 6 km away
- Proposed forest land to be diverted for Entry/Exit approach to Nayara Energy… — lapsed, 6 km away
- Ordinary Soil Mining Project — lapsed, 8.1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.