What is this project?
Greenfield Project with Installation of 2 x 9 MVA Submerged Arc Furnace (SAF) to make 35,176 TPA Ferro Manganese / Silico Manganese / Ferro Chrome / Silico Chrome/ Ferro Silicon) and 2 x 4.5 MVA Electric Arc Furnace (EAF) to make 29,700 TPA Low Carbon Ferro Chrome" at Mouza: Chausal, PS: Gangajalghati, District- Bankura, West Bengal by M/s Hariaksh Industries Pvt. Ltd is an approved industrial project in Chausal, Gangajalghati, Bankura, West Bengal. The site covers 10.4 acres.
Who is building it?
The applicant is Hariaksh Industries PVT LTD.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 29 Aug 2023), as of 27 Nov 2026.
Where is it?
In Chausal, Gangajalghati, Bankura, West Bengal.
How big is it?
It has a stated cost of ₹92.6 crore and a site of 10.4 acres.
When was it filed?
The application was filed on 29 Aug 2023.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 29 Aug 2023 |
| Application filed | 29 Aug 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Industry |
| Applicant | Hariaksh Industries PVT LTD |
| Land area | 10.4 acres (4.2 ha) |
| Project cost | ₹92.6 crore |
| Village / locality | Chausal |
| Taluk / tehsil | Gangajalghati |
| District | Bankura |
| State | West Bengal |
| Location from | Site boundary on record |
| Our reference | WID-WB-00022 |
In context
69 applications in Bankura since January 2022 are in the same category (Industry): 29 approved, 23 filed or under review, and 17 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 10.4 acres, this one is smaller than 83% of them.
15 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Chausal, Gangajalghati, Bankura, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed 3X9 MVA Ferro Alloy plant and 30 TPD Sinter Plant — under environmental review, 500 m away
- Proposed 3X9 MVA Ferro Alloy plant and 30 TPD Sinter Plant — more information requested, 500 m away
- Proposed 3X9 MVA Ferro Alloy plant and 30 TPD Sinter Plant — returned to applicant, 500 m away
- Proposed Steel Plant by Installation of 8 x 18 MVA SEAF, Electric Arc Furnace… — lapsed, 1.3 km away
- Greenfield steel Plant for production of 426000 TPA (max) ferro alloys, 260000… — under environmental review, 1.3 km away
- Proposed Steel & Alloy Plant by Installation of 8 x 18 MVA SEAF, Electric Arc… — more information requested, 1.3 km away
- Proposed Steel & Alloy Plant by Installation of 8 x 18 MVA SEAF, Electric Arc… — returned to applicant, 1.3 km away
- Barsal Shrirampur & Duberdanga Blackstone Mine — environmental approval granted, 3.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.