Quick answers
What is Proposed 3X9 MVA Ferro Alloy plant and 30 TPD Sinter Plant?
Proposed 3X9 MVA Ferro Alloy plant and 30 TPD Sinter Plant is a proposed industrial project in Chausal, Gangajalghati, Bankura, West Bengal. The site covers 12.7 acres.
Who is building it?
The applicant is Nilkanth Ferro Limited.
Has it been approved?
Not yet. The application is still under review: its status is “Returned to applicant”, as of 27 Nov 2026.
Where is it?
In Chausal, Gangajalghati, Bankura, West Bengal.
How big is it?
It has a stated cost of ₹51.1 crore and a site of 12.7 acres.
When was it filed?
The application was filed on 24 Aug 2023.
One of 3 filings for this project. The project's main page, with every filing and where each stands: Proposed 3X9 MVA Ferro Alloy plant and 30 TPD Sinter Plant
Project details
| Status | Returned to applicant |
|---|---|
| Status since | 3 Oct 2023 |
| Application filed | 24 Aug 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Industry |
| Applicant | Nilkanth Ferro Limited |
| Land area | 12.7 acres (5.1 ha) |
| Project cost | ₹51.1 crore |
| Village / locality | Chausal |
| Taluk / tehsil | Gangajalghati |
| District | Bankura |
| State | West Bengal |
| Location from | Site boundary on record |
| Our reference | WID-WB-00103 |
All filings for this project
This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 2 Nov 2026 | Under environmental review | 12.7 acres | ₹51.1 crore |
| New project filed 30 Dec 2023 | More information requested | 12.7 acres | ₹51.1 crore |
| New project filed 24 Aug 2023 (this page) | Returned to applicant | 12.7 acres | ₹51.1 crore |
In context
69 applications in Bankura since January 2022 are in the same category (Industry): 29 approved, 23 filed or under review, and 17 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 12.7 acres, this one is smaller than 71% of them.
15 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Chausal, Gangajalghati, Bankura, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed 3X9 MVA Ferro Alloy plant and 30 TPD Sinter Plant — under environmental review, 0 m away
- Proposed 3X9 MVA Ferro Alloy plant and 30 TPD Sinter Plant — more information requested, 0 m away
- Greenfield Project with Installation of 2 x 9 MVA Submerged Arc Furnace (SAF)… — environmental approval granted, 500 m away
- Proposed Steel Plant by Installation of 8 x 18 MVA SEAF, Electric Arc Furnace… — lapsed, 1.7 km away
- Greenfield steel Plant for production of 426000 TPA (max) ferro alloys, 260000… — under environmental review, 1.8 km away
- Proposed Steel & Alloy Plant by Installation of 8 x 18 MVA SEAF, Electric Arc… — more information requested, 1.8 km away
- Proposed Steel & Alloy Plant by Installation of 8 x 18 MVA SEAF, Electric Arc… — returned to applicant, 1.8 km away
- Barsal Shrirampur & Duberdanga Blackstone Mine — environmental approval granted, 3.6 km away
All 3 Nilkanth Ferro projects across India