One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed Greenfield project of integrated paint manufacturing plant located at plot no.…
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 17 Aug 2023 |
| Application filed | 17 Aug 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Berger Paints India Limited |
| Land area | 29.9 acres (12.1 ha) |
| Project cost | ₹803 crore |
| Village / locality | Kanksa |
| Taluk / tehsil | Kanksa |
| District | Paschim Bardhaman |
| State | West Bengal |
| Location from | Site boundary on record |
| Our reference | WID-WB-00133 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 6 May 2024 | Environmental approval granted | 29.9 acres | ₹803 crore |
| Early planning filed 17 Aug 2023 (this page) | Cleared for impact study | 29.9 acres | ₹803 crore |
In context
169 applications in Paschim Bardhaman since January 2022 are in the same category (Industry): 81 approved, 49 filed or under review, and 39 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 29.9 acres, this one is smaller than 51% of them.
15 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kanksa, Paschim Bardhaman, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Greenfield project of integrated paint manufacturing plant located at… — environmental approval granted, 0 m away
- Expansion of the Existing Ferro Alloy Plant from 1800 TPA to 3600 TPA (max)… — environmental approval granted, 1.3 km away
- Expansion of the Existing Ferro Alloy Plant from 1800 TPA to 3600 TPA (max)… — cleared for impact study, 1.3 km away
- Expansion of the Existing Ferro Alloy Plant from 1800 TPA to 3600 TPA (max)… — withdrawn, 1.3 km away
- "NO INCREASE IN POLLUTION LOAD" with 15% Enhancement in the Existing… — initial checks, 2.1 km away
- Expansion of Grain Based Distillery From 660 Klpd to 770 Klpd by Enabling… — initial checks, 2.1 km away
- Proposed Chemical cluster & Grain based Distillery by M/s Matix Fertilisers… — cleared for impact study, 2.1 km away
- Proposed Chemical cluster & Grain based Distillery by M/s Matix Fertilisers… — returned to applicant, 2.1 km away
All 13 Berger Paints India projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.