One of 3 filings for this project. The project's main page, with every filing and where each stands: Expansion of the Existing Ferro Alloy Plant from 1800 TPA to 3600 TPA (max) for…
Project details
| Status | Withdrawn |
|---|---|
| Status since | 7 Jul 2023 |
| Application filed | 30 Jun 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Satvik Enterprises Limited |
| Land area | 2 acres (0.8 ha) |
| Project cost | ₹13.9 crore |
| Village / locality | Kanksa |
| Taluk / tehsil | Kanksa |
| District | Paschim Bardhaman |
| State | West Bengal |
| Location from | Site boundary on record |
| Our reference | WID-WB-00302 |
All filings for this project
This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 21 Jan 2025 | Environmental approval granted | 2 acres | ₹13.9 crore |
| Early planning filed 13 Jul 2023 | Cleared for impact study | 2 acres | ₹13.9 crore |
| Early planning filed 30 Jun 2023 (this page) | Withdrawn | 2 acres | ₹13.9 crore |
In context
169 applications in Paschim Bardhaman since January 2022 are in the same category (Industry): 81 approved, 49 filed or under review, and 39 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 2 acres, this one is smaller than 96% of them.
11 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kanksa, Paschim Bardhaman, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion of the Existing Ferro Alloy Plant from 1800 TPA to 3600 TPA (max)… — environmental approval granted, 0 m away
- Expansion of the Existing Ferro Alloy Plant from 1800 TPA to 3600 TPA (max)… — cleared for impact study, 0 m away
- Expansion of Grain Based Distillery From 660 Klpd to 770 Klpd by Enabling… — initial checks, 850 m away
- Proposed Greenfield project of integrated paint manufacturing plant located at… — environmental approval granted, 1.3 km away
- Proposed Greenfield project of integrated paint manufacturing plant located at… — cleared for impact study, 1.3 km away
- 220KV D/C & M/C Transmission Line for D/C of Existing 220KV Durgapur-Bktps… — lapsed, 2.3 km away
- "NO INCREASE IN POLLUTION LOAD" with 15% Enhancement in the Existing… — initial checks, 3.1 km away
- Validity Extension of the Existing Environmental Clearance [F. No.… — returned to applicant, 3.2 km away
3 Satvik Enterprises projects in Paschim Bardhaman
All 7 Satvik Enterprises projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.