Returned to applicantIndustry · Bankura, West Bengal

Proposed expansion project of the existing DRI Plant (2x100 TPD) by installing 2x600 TPD DRI Plant, 1x1.4 MTPA Iron Ore Beneficiation Plant, 1x0.85 MTPA Pellet Plant, 4x25T Induction Furnaces with matching LRF & CCM, 6,60,000 TPA Rolling Mills with 40 TPH Reheating Furnace, 4x16 MVA Ferrro Alloy Plant with matching Sintering and 20 TPH Chrome Ore Briquetting Plant, 2x25T Electric Arc Furnaces and 45 MW Captive Power Plant (41 MW WHRB & 4 MW AFBC)

Proposed expansion project of the existing DRI Plant (2x100 TPD) by installing 2x600 TPD DRI Plant, 1x1.4 MTPA Iron Ore Beneficiation Plant, 1x0.85 MTPA Pellet Plant, 4x25T Induction Furnaces with matching LRF & CCM, 6,60,000 TPA Rolling Mills with 40 TPH Reheating Furnace, 4x16 MVA Ferrro Alloy Plant with matching Sintering and 20 TPH Chrome Ore Briquetting Plant, 2x25T Electric Arc Furnaces and 45 MW Captive Power Plant (41 MW WHRB & 4 MW AFBC) is a proposed industrial project in Bara Nimdiha, Barjora, Bankura, West Bengal. The site covers 94.6 acres. Its stated project cost is ₹664.2 crore. As of 27 Nov 2026, its status is “Returned to applicant” (since 8 Dec 2023).

See it on the live map All projects in Bankura

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed expansion project of the existing DRI Plant (2x100 TPD) by installing 2x600 TPD DRI Plant, 1x1.4 MTPA Iron Ore Beneficiation Plant, 1x0.85 MTPA Pellet Plant, 4x25T Induction Furnaces with matching LRF & CCM, 6,60,000 TPA Rolling Mills with 40 TPH Reheating Furnace, 4x16 MVA Ferrro Alloy Plant with matching Sintering and 20 TPH Chrome Ore Briquetting Plant, 2x25T Electric Arc Furnaces and 45 MW Captive Power Plant (41 MW WHRB & 4 MW AFBC) is a proposed industrial project in Bara Nimdiha, Barjora, Bankura, West Bengal. The site covers 94.6 acres.

Who is building it?

The applicant is Cic Steels Private Limited.

Has it been approved?

Not yet. The application is still under review: its status is “Returned to applicant”, as of 27 Nov 2026.

Where is it?

In Bara Nimdiha, Barjora, Bankura, West Bengal.

How big is it?

It has a stated cost of ₹664.2 crore and a site of 94.6 acres.

When was it filed?

The application was filed on 8 Nov 2023.

One of 3 filings for this project. The project's main page, with every filing and where each stands: Proposed expansion project of the existing DRI Plant (2x100 TPD) by installing 2x600 TPD…

Project details

StatusReturned to applicant
Status since8 Dec 2023
Application filed8 Nov 2023
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantCic Steels Private Limited
Land area94.6 acres (38.3 ha)
Project cost₹664.2 crore
Village / localityBara Nimdiha
Taluk / tehsilBarjora
DistrictBankura
StateWest Bengal
Location fromSite boundary on record
Our referenceWID-WB-00252

All filings for this project

This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Ownership transfer filed 27 Nov 2024Lapsed94.6 acres₹664.2 crore
Early planning filed 8 Nov 2023 (this page)Returned to applicant94.6 acres₹664.2 crore
Expansion filed 8 Nov 2023Environmental approval granted94.6 acres₹664.2 crore

In context

69 applications in Bankura since January 2022 are in the same category (Industry): 29 approved, 23 filed or under review, and 17 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 94.6 acres, this one is larger than 89% of them.

22 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Bara Nimdiha, Barjora, Bankura, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.