Quick answers
What is this project?
Ferro-Alloy Plant (SAF 2x9 MVA) and Ferro-Chrome Briquetting Plant (10 TPH is a lapsed industrial project in Murapara, Barjora, Bankura, West Bengal. The site covers 9.2 acres.
Who is building it?
The applicant is Satvik Enterprises Limited.
Has it been approved?
No. The application was lapsed on 29 Oct 2024, so it is no longer under consideration.
Where is it?
In Murapara, Barjora, Bankura, West Bengal.
How big is it?
It has a stated cost of ₹36.5 crore and a site of 9.2 acres.
When was it filed?
The application was filed on 20 Jun 2023.
One of 4 filings for this project. The project's main page, with every filing and where each stands: Ferro-Alloy Plant (SAF 2x9 MVA) and Ferro-Chrome Briquetting Plant (10 TPH
Project details
| Official title | Proposed Installation of Ferro-Alloy Plant (SAF 2x9 MVA) and Ferro-Chrome Briquetting Plant (10 TPH |
|---|---|
| Status | Lapsed |
| Status since | 29 Oct 2024 |
| Application filed | 20 Jun 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Satvik Enterprises Limited |
| Land area | 9.2 acres (3.7 ha) |
| Project cost | ₹36.5 crore |
| Village / locality | Murapara |
| Taluk / tehsil | Barjora |
| District | Bankura |
| State | West Bengal |
| Location from | Site boundary on record |
| Our reference | WID-WB-00379 |
All filings for this project
This project has 4 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Early planning filed 20 Jun 2023 (this page) | Lapsed | 9.2 acres | ₹36.5 crore |
| New project filed 20 Jun 2023 | Environmental approval granted | 15.1 acres | ₹36.5 crore |
| New project filed 22 May 2023 | Lapsed | 15.1 acres | ₹36.5 crore |
| Early planning filed 20 Feb 2023 | Application filed | 15.1 acres | ₹36.5 crore |
In context
69 applications in Bankura since January 2022 are in the same category (Industry): 29 approved, 23 filed or under review, and 17 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 9.2 acres, this one is smaller than 88% of them.
21 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Murapara, Barjora, Bankura, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Ferro-Alloy Plant (SAF 2x9 MVA) and Ferro-Chrome Briquetting Plant (10 TPH — environmental approval granted, 150 m away
- Ferro-Alloy Plant (SAF 2x9 MVA) and Ferro-Chrome Briquetting Plant (10 TPH) — lapsed, 150 m away
- Ferro-Alloy Plant (SAF 2x9 MVA) and Ferro-Chrome Briquetting Plant (10 TPH) — application filed, 150 m away
- Proposed Expansion of Ferro-Alloy Plant (SAF - 1x9 MVA) by installation of… — environmental approval granted, 550 m away
- Application for "No Increase in Pollution Load" Certificate for Change in… — initial checks, 700 m away
- Proposed expansion project of the existing DRI Plant (2x100 TPD) by installing… — lapsed, 700 m away
- Proposed expansion project of the existing DRI Plant (2x100 TPD) by installing… — environmental approval granted, 700 m away
- Proposed expansion project of the existing DRI Plant (2x100 TPD) by installing… — returned to applicant, 700 m away
4 Satvik Enterprises projects in Bankura
All 7 Satvik Enterprises projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.