One of 3 filings for this project. The project's main page, with every filing and where each stands: Expansion of Integrated Steel Plant: Sponge Iron from 3,18,000 TPA to 9,12,000 TPA, MS…
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 10 Mar 2023 |
| Application filed | 21 Feb 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Giridhan Metal Private Limited |
| Land area | 87 acres (35.2 ha) |
| Project cost | ₹1,856.7 crore |
| Village / locality | Mandalpur |
| Taluk / tehsil | Jamuria |
| District | Paschim Bardhaman |
| State | West Bengal |
| Location from | Site boundary on record |
| Our reference | WID-WB-00345 |
All filings for this project
This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Amendment filed 26 Aug 2025 | Environmental approval granted | 87 acres | ₹1,856.7 crore |
| Expansion filed 22 Feb 2024 | Environmental approval granted | 87 acres | ₹1,856.7 crore |
| Early planning filed 21 Feb 2023 (this page) | Cleared for impact study | 87 acres | ₹1,856.7 crore |
In context
169 applications in Paschim Bardhaman since January 2022 are in the same category (Industry): 81 approved, 49 filed or under review, and 39 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 87 acres, this one is larger than 74% of them.
63 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Mandalpur, Jamuria, Paschim Bardhaman, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion of Integrated Steel Plant: Sponge Iron from 3,18,000 TPA to 9,12,000… — environmental approval granted, 0 m away
- Expansion of Integrated Steel Plant: Sponge Iron from 3,18,000 TPA to 9,12,000… — environmental approval granted, 0 m away
- Expansion of Sponge Iron production from 3,18,000 TPA to 3,88,000 TPA by… — initial checks, 50 m away
- No increase in Pollution Load for Proposed change in fuel mix from Coal to… — initial checks, 600 m away
- EC Amendment in Proposed expansion cum modification of 0.85 MTPA Integrated… — environmental approval granted, 600 m away
- Expansion of Sponge Iron Plant consisting 2x100TPD DRI Kiln with addition of… — returned to applicant, 700 m away
- Application for "No Increase in Pollution Load" Certificate for Change in Raw… — initial checks, 800 m away
- Application of "No Increase in Pollution Load" Certificate for Change in… — initial checks, 800 m away
More from Giridhan Metal Private Limited in Paschim Bardhaman
- Proposed ISP: Iron Ore Beneficiation Plant (2.8 MTPA), Pelletization Plant (2… — environmental approval granted
- Proposed ISP: Iron Ore Beneficiation Plant (2.8 MTPA), Pelletization Plant (2… — cleared for impact study
- Expansion of Sponge Iron production from 3,18,000 TPA to 3,88,000 TPA by… — initial checks
All 6 Giridhan Metal projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.