Project details
| Status | Initial checks |
|---|---|
| Status since | 27 Nov 2024 |
| Application filed | 27 Nov 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Giridhan Metal Private Limited |
| Use | Industrial |
| Land area | 78.4 acres (31.7 ha) |
| Plot area | 3,17,400 m² (34,16,462 sq ft) |
| Project cost | ₹997 crore |
| Village / locality | Mandalpur |
| Taluk / tehsil | Jamuria |
| District | Paschim Bardhaman |
| State | West Bengal |
| Location from | Site boundary on record |
| Our reference | WID-WB-00737 |
In context
22 applications in Paschim Bardhaman since January 2022 are in the same category (Buildings & townships): 5 approved, 15 filed or under review, and 2 withdrawn, lapsed or rejected. At 78.4 acres, this one is smaller than 55% of them.
65 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Mandalpur, Jamuria, Paschim Bardhaman, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion of Integrated Steel Plant: Sponge Iron from 3,18,000 TPA to 9,12,000… — environmental approval granted, 50 m away
- Expansion of Integrated Steel Plant: Sponge Iron from 3,18,000 TPA to 9,12,000… — environmental approval granted, 50 m away
- Expansion of Integrated Steel Plant: Sponge Iron from 3,18,000 TPA to 9,12,000… — cleared for impact study, 50 m away
- No increase in Pollution Load for Proposed change in fuel mix from Coal to… — initial checks, 600 m away
- EC Amendment in Proposed expansion cum modification of 0.85 MTPA Integrated… — environmental approval granted, 600 m away
- Expansion of Sponge Iron Plant consisting 2x100TPD DRI Kiln with addition of… — returned to applicant, 750 m away
- Application for "No Increase in Pollution Load" Certificate for Change in Raw… — initial checks, 800 m away
- Application of "No Increase in Pollution Load" Certificate for Change in… — initial checks, 800 m away
More from Giridhan Metal Private Limited in Paschim Bardhaman
- Proposed ISP: Iron Ore Beneficiation Plant (2.8 MTPA), Pelletization Plant (2… — environmental approval granted
- Proposed ISP: Iron Ore Beneficiation Plant (2.8 MTPA), Pelletization Plant (2… — cleared for impact study
- Expansion of Integrated Steel Plant: Sponge Iron from 3,18,000 TPA to 9,12,000… — environmental approval granted
- Expansion of Integrated Steel Plant: Sponge Iron from 3,18,000 TPA to 9,12,000… — environmental approval granted
- Expansion of Integrated Steel Plant: Sponge Iron from 3,18,000 TPA to 9,12,000… — cleared for impact study
All 6 Giridhan Metal projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.