Proposed Downstream petrochemical and coaltar distillation unit at Vill. Shyampur, Mouza- Kalpaini, PO. Jambedia, PS. Barjora, Dist. Bankura, West Bengal By M/s. Odin Petroleum Products Pvt. Ltd. (OPPPL) is a lapsed industrial project in Shyampur, Barjora, Bankura, West Bengal. The site covers 0.7 acres.
Who is building it?
The applicant is Odin Petroleum Products PVT. LTD..
Has it been approved?
No. The application was lapsed on 18 Nov 2024, so it is no longer under consideration.
Where is it?
In Shyampur, Barjora, Bankura, West Bengal.
How big is it?
It has a stated cost of ₹2.7 crore and a site of 0.7 acres.
When was it filed?
The application was filed on 13 Oct 2023.
Project details
| Status | Lapsed |
|---|---|
| Status since | 18 Nov 2024 |
| Application filed | 13 Oct 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Industry |
| Applicant | Odin Petroleum Products PVT. LTD. |
| Land area | 3,000 m² |
| Project cost | ₹2.7 crore |
| Village / locality | Shyampur |
| Taluk / tehsil | Barjora |
| District | Bankura |
| State | West Bengal |
| Location from | Site boundary on record |
| Our reference | WID-WB-00463 |
In context
69 applications in Bankura since January 2022 are in the same category (Industry): 29 approved, 23 filed or under review, and 17 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 0.7 acres, this one is smaller than 98% of them.
5 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Shyampur, Barjora, Bankura, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Industrial project by Mali Agritech Private Limited — under forest review, 2.1 km away
- Industrial project by Mali Agritech Private Limited — lapsed, 2.1 km away
- Common Bio Medical Waste Treatment Facility proposed by M/S SNG… — environmental approval granted, 4.3 km away
- Greenfield LC Ferro-Alloy Plant for production of 6,000 TPA (max.) of Low… — environmental approval granted, 4.8 km away
- Greenfield LC Ferro-Alloy Plant for production of 6,000 TPA (max.) of Low… — cleared for impact study, 4.8 km away
- Proposed Sponge Iron Plant (2 X 350 TPD DRI Kilns) 0.231 MTPA, Induction… — lapsed, 6.9 km away
- Application for "No Increase in Pollution Load" Certificate for Change in… — initial checks, 7.1 km away
- Proposed expansion project of the existing DRI Plant (2x100 TPD) by installing… — lapsed, 7.1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.