LapsedIndustry · Bankura, West Bengal

Proposed Sponge Iron Plant (2 X 350 TPD DRI Kilns) 0.231 MTPA, Induction Furnace (3 X 30MT) with 2 strands of 6 X 11 m Concast 0.28215 MTPA, Structural / TMT Rolling Mill (1 X 750 TPD) 0.2475 MTPA, Submerged Arc Furnaces (Ferro Alloy Plant Si-Mn) (2 X 12 MVA) 0.0468 MTPA, Captive Power Plant 32 MW (22 MW WHRB + 10 MW AFBC) by M/s Golden castings & Ispat Limited

Proposed Sponge Iron Plant (2 X 350 TPD DRI Kilns) 0.231 MTPA, Induction Furnace (3 X 30MT) with 2 strands of 6 X 11 m Concast 0.28215 MTPA, Structural / TMT Rolling Mill (1 X 750 TPD) 0.2475 MTPA, Submerged Arc Furnaces (Ferro Alloy Plant Si-Mn) (2 X 12 MVA) 0.0468 MTPA, Captive Power Plant 32 MW (22 MW WHRB + 10 MW AFBC) by M/s Golden castings & Ispat Limited is a lapsed industrial project in Baikunthapur, Barjora, Bankura, West Bengal. The site covers 30 acres. Its stated project cost is ₹329 crore. As of 27 Nov 2026, its status is “Lapsed” (since 20 Sept 2025).

See it on the live map All projects in Bankura

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed Sponge Iron Plant (2 X 350 TPD DRI Kilns) 0.231 MTPA, Induction Furnace (3 X 30MT) with 2 strands of 6 X 11 m Concast 0.28215 MTPA, Structural / TMT Rolling Mill (1 X 750 TPD) 0.2475 MTPA, Submerged Arc Furnaces (Ferro Alloy Plant Si-Mn) (2 X 12 MVA) 0.0468 MTPA, Captive Power Plant 32 MW (22 MW WHRB + 10 MW AFBC) by M/s Golden castings & Ispat Limited is a lapsed industrial project in Baikunthapur, Barjora, Bankura, West Bengal. The site covers 30 acres.

Who is building it?

The applicant is GOLDEN CASTINGs & ISPAT LIMITED.

Has it been approved?

No. The application was lapsed on 20 Sept 2025, so it is no longer under consideration.

Where is it?

In Baikunthapur, Barjora, Bankura, West Bengal.

How big is it?

It has a stated cost of ₹329 crore and a site of 30 acres.

When was it filed?

The application was filed on 14 Aug 2025.

Project details

StatusLapsed
Status since20 Sept 2025
Application filed14 Aug 2025
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantGOLDEN CASTINGs & ISPAT LIMITED
Land area30 acres (12.1 ha)
Project cost₹329 crore
Village / localityBaikunthapur
Taluk / tehsilBarjora
DistrictBankura
StateWest Bengal
Location fromSite boundary on record
Our referenceWID-WB-01469

In context

69 applications in Bankura since January 2022 are in the same category (Industry): 29 approved, 23 filed or under review, and 17 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 30 acres, this one is larger than 69% of them.

31 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Baikunthapur, Barjora, Bankura, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.