What is Developing? Open the mapMap

Cleared for impact studyIndustry · Uttar Dinajpur, West Bengal

Setting up manufacturing unit of Synthetic Resin viz Urea-Formaldehyde (U-F) Resin, Melamine - Formaldehyde (M-F) Resin and Phenol-Formaldehyde (P-F) Resin with total production capacity of 12000 TPA

Setting up manufacturing unit of Synthetic Resin viz Urea-Formaldehyde (U-F) Resin, Melamine - Formaldehyde (M-F) Resin and Phenol-Formaldehyde (P-F) Resin with total production capacity of 12000 TPA is a proposed industrial project in Ganesbati, Kaliaganj, Uttar Dinajpur, West Bengal. The site covers 2.2 acres. Its stated project cost is ₹72 lakh. As of 27 Nov 2026, its status is “Cleared for impact study” (since 23 Dec 2023).

See it on the live map All projects in Uttar Dinajpur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

One of 3 filings for this project. The project's main page, with every filing and where each stands: Setting up manufacturing unit of Synthetic Resin viz Urea-Formaldehyde (U-F) Resin,…

Project details

StatusCleared for impact study
Status since23 Dec 2023
Application filed23 Dec 2023
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantAdonis Plywood Industries Private Limited
Land area2.2 acres (0.9 ha)
Project cost₹72 lakh
Village / localityGanesbati
Taluk / tehsilKaliaganj
DistrictUttar Dinajpur
StateWest Bengal
Location fromSite boundary on record
Our referenceWID-WB-00472

All filings for this project

This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Amendment filed 11 Nov 2025Environmental approval granted2.2 acres₹72 lakh
New project filed 4 Feb 2025Environmental approval granted2.2 acres₹72 lakh
Early planning filed 23 Dec 2023 (this page)Cleared for impact study2.2 acres₹72 lakh

In context

7 applications in Uttar Dinajpur since January 2022 are in the same category (Industry): 7 approved, 0 filed or under review, and 0 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval.

3 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Ganesbati, Kaliaganj, Uttar Dinajpur, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

All 3 Adonis Plywood Industries projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.