What is Developing? Open the mapMap

Cleared for impact studyIndustry · Uttar Dinajpur, West Bengal

Industrial project by M/s. ECO VISION INDIA proposes for Setting up manufacturing unit of Synthetic Resin viz. Urea Formaldehyde Resin - 2304 TPA (UF Resin), Melamine Formaldehyde Resin - 2304 TPA (MF Resin), Melamine Urea Formaldehyde Resin - 2304 TPA (MUF Resin) and Phenol Formaldehyde Resin - 864 TPA (PF Resin)

This proposed industrial project by M/s. ECO VISION INDIA proposes for Setting up manufacturing unit of Synthetic Resin viz. Urea Formaldehyde Resin - 2304 TPA (UF Resin), Melamine Formaldehyde Resin - 2304 TPA (MF Resin), Melamine Urea Formaldehyde Resin - 2304 TPA (MUF Resin) and Phenol Formaldehyde Resin - 864 TPA (PF Resin) is in Haldibari, Kaliaganj, Uttar Dinajpur, West Bengal. The site covers 0.2 acres. Its stated project cost is ₹72 lakh. As of 27 Nov 2026, its status is “Cleared for impact study” (since 11 Sept 2025).

See it on the live map All projects in Uttar Dinajpur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Industrial project by M/s. ECO VISION INDIA proposes for Setting up manufacturing unit…

Project details

StatusCleared for impact study
Status since11 Sept 2025
Application filed9 Aug 2025
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantSubhadip Das
Land area800 m²
Project cost₹72 lakh
Village / localityHaldibari
Taluk / tehsilKaliaganj
DistrictUttar Dinajpur
StateWest Bengal
Location fromSite boundary on record
Our referenceWID-WB-01193

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 4 Apr 2026Environmental approval granted0.2 acres₹72 lakh
Early planning filed 9 Aug 2025 (this page)Cleared for impact study0.2 acres₹72 lakh

In context

7 applications in Uttar Dinajpur since January 2022 are in the same category (Industry): 7 approved, 0 filed or under review, and 0 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval.

4 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Haldibari, Kaliaganj, Uttar Dinajpur, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.