What is Developing? Open the mapMap

WithdrawnIndustry · Bankura, West Bengal

Proposed Expansion project of Sponge Iron plant 1x250 TPD and 2x350 TPD DRI Kilns (3,13,500 TPA Sponge Iron), Induction Furnace with matching LRF & CCM 6x15 T (2,97,000 TPA Billets), Capacity enhancement of Existing Rolling Mill from 0.132 MTPA to 0.2 MTPA, Submerged Arc Furnaces 2x12 MVA (46,800 TPA Si-Mn or 64,800 TPA Fe-Mn or 21,600 TPA Fe-Si or 50,400 TPA Fe-Cr), Captive Power Plant 32 MW (22 MW WHRB based + 10MV AFBC based)

Proposed Expansion project of Sponge Iron plant 1x250 TPD and 2x350 TPD DRI Kilns (3,13,500 TPA Sponge Iron), Induction Furnace with matching LRF & CCM 6x15 T (2,97,000 TPA Billets), Capacity enhancement of Existing Rolling Mill from 0.132 MTPA to 0.2 MTPA, Submerged Arc Furnaces 2x12 MVA (46,800 TPA Si-Mn or 64,800 TPA Fe-Mn or 21,600 TPA Fe-Si or 50,400 TPA Fe-Cr), Captive Power Plant 32 MW (22 MW WHRB based + 10MV AFBC based) is a withdrawn industrial project in Jagannathpur, Bankura - Ii, Bankura, West Bengal. The site covers 92.7 acres. Its stated project cost is ₹342 crore. As of 27 Nov 2026, its status is “Withdrawn” (since 19 Mar 2024).

See it on the live map All projects in Bankura

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed Expansion project of Sponge Iron plant 1x250 TPD and 2x350 TPD DRI Kilns (3,13,500 TPA Sponge Iron), Induction Furnace with matching LRF & CCM 6x15 T (2,97,000 TPA Billets), Capacity enhancement of Existing Rolling Mill from 0.132 MTPA to 0.2 MTPA, Submerged Arc Furnaces 2x12 MVA (46,800 TPA Si-Mn or 64,800 TPA Fe-Mn or 21,600 TPA Fe-Si or 50,400 TPA Fe-Cr), Captive Power Plant 32 MW (22 MW WHRB based + 10MV AFBC based) is a withdrawn industrial project in Jagannathpur, Bankura - Ii, Bankura, West Bengal. The site covers 92.7 acres.

Who is building it?

The applicant is Alaknanda Balmukund Ispat Private Limited.

Has it been approved?

No. The application was withdrawn on 19 Mar 2024, so it is no longer under consideration.

Where is it?

In Jagannathpur, Bankura - Ii, Bankura, West Bengal.

How big is it?

It has a stated cost of ₹342 crore and a site of 92.7 acres.

When was it filed?

The application was filed on 24 Feb 2024.

One of 5 filings for this project. The project's main page, with every filing and where each stands: Proposed Expansion project of Sponge Iron plant 1x250 TPD and 2x350 TPD DRI Kilns…

Project details

StatusWithdrawn
Status since19 Mar 2024
Application filed24 Feb 2024
Approval soughtEnvironmental approval
Application typeOwnership transfer
SectorIndustry
ApplicantAlaknanda Balmukund Ispat Private Limited
Land area92.7 acres (37.5 ha)
Project cost₹342 crore
Village / localityJagannathpur
Taluk / tehsilBankura - Ii
DistrictBankura
StateWest Bengal
Location fromSite boundary on record
Our referenceWID-WB-00523

All filings for this project

This project has 5 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Amendment filed 11 Nov 2025Environmental approval granted92.7 acres₹342 crore
Expansion filed 10 Jul 2024Environmental approval granted92.7 acres₹342 crore
Ownership transfer filed 20 Mar 2024Environmental approval granted92.7 acres₹342 crore
Ownership transfer filed 24 Feb 2024 (this page)Withdrawn92.7 acres₹342 crore
Early planning filed 3 May 2023Cleared for impact study92.7 acres₹342 crore

In context

69 applications in Bankura since January 2022 are in the same category (Industry): 29 approved, 23 filed or under review, and 17 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 92.7 acres, this one is larger than 82% of them.

Where it is

Jagannathpur, Bankura - Ii, Bankura, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

All 5 Alaknanda Balmukund Ispat projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.