What is this project?
Proposed Expansion project of Sponge Iron plant 1x250 TPD and 2x350 TPD DRI Kilns (3,13,500 TPA Sponge Iron), Induction Furnace with matching LRF & CCM 6x15 T (2,97,000 TPA Billets), Capacity enhancement of Existing Rolling Mill from 0.132 MTPA to 0.2 MTPA, Submerged Arc Furnaces 2x12 MVA (46,800 TPA Si-Mn or 64,800 TPA Fe-Mn or 21,600 TPA Fe-Si or 50,400 TPA Fe-Cr), Captive Power Plant 32 MW (22 MW WHRB based + 10MV AFBC based) is an approved industrial project in Jagannathpur, Bankura - Ii, Bankura, West Bengal. The site covers 92.7 acres.
Who is building it?
The applicant is Alaknanda Balmukund Ispat Private Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 6 Jan 2026), as of 27 Nov 2026.
Where is it?
In Jagannathpur, Bankura - Ii, Bankura, West Bengal.
How big is it?
It has a stated cost of ₹342 crore and a site of 92.7 acres.
When was it filed?
The application was filed on 11 Nov 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 6 Jan 2026 |
| Application filed | 11 Nov 2025 |
| Approval sought | Environmental approval |
| Application type | Amendment |
| Sector | Industry |
| Applicant | Alaknanda Balmukund Ispat Private Limited |
| Land area | 92.7 acres (37.5 ha) |
| Project cost | ₹342 crore |
| Village / locality | Jagannathpur |
| Taluk / tehsil | Bankura - Ii |
| District | Bankura |
| State | West Bengal |
| Location from | Site boundary on record |
| Our reference | WID-WB-01391 |
All filings for this project
This project has 5 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Amendment filed 11 Nov 2025 (this page) | Environmental approval granted | 92.7 acres | ₹342 crore |
| Expansion filed 10 Jul 2024 | Environmental approval granted | 92.7 acres | ₹342 crore |
| Ownership transfer filed 20 Mar 2024 | Environmental approval granted | 92.7 acres | ₹342 crore |
| Ownership transfer filed 24 Feb 2024 | Withdrawn | 92.7 acres | ₹342 crore |
| Early planning filed 3 May 2023 | Cleared for impact study | 92.7 acres | ₹342 crore |
In context
69 applications in Bankura since January 2022 are in the same category (Industry): 29 approved, 23 filed or under review, and 17 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 92.7 acres, this one is larger than 82% of them.
Where it is
Jagannathpur, Bankura - Ii, Bankura, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Expansion project of Sponge Iron plant 1x250 TPD and 2x350 TPD DRI… — environmental approval granted, 0 m away
- Proposed Expansion project of Sponge Iron plant 1x250 TPD and 2x350 TPD DRI… — environmental approval granted, 0 m away
- Proposed Expansion project of Sponge Iron plant 1x250 TPD and 2x350 TPD DRI… — withdrawn, 0 m away
- Proposed Expansion project of Sponge Iron plant 1x250 TPD and 2x350 TPD DRI… — cleared for impact study, 0 m away
- Paharia Sand Mine — initial checks, 5.9 km away
- MIN_BNK_56 Sand Mine — environmental approval granted, 10.6 km away
- MIN_BNK_56 Sand Mine — cleared for impact study, 10.6 km away
- MIN_BNK_57 Sand Mine — cleared for impact study, 11 km away
All 5 Alaknanda Balmukund Ispat projects across India