One of 2 filings for this project. The project's main page, with every filing and where each stands: Re-Rolling Mill Steel Plant located at R.S. & L.R. Plot No. 2849, 2861, 2862/3380,…
Project details
| Status | Not approved |
|---|---|
| Status since | 31 Jul 2024 |
| Application filed | 19 Apr 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Mechfast Engineering Private Limited |
| Land area | 1.4 acres (0.6 ha) |
| Project cost | ₹6.9 crore |
| Village / locality | Mandalpur |
| Taluk / tehsil | Jamuria |
| District | Paschim Bardhaman |
| State | West Bengal |
| Location from | Site boundary on record |
| Our reference | WID-WB-00650 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Early planning filed 19 Apr 2024 (this page) | Not approved | 1.4 acres | ₹6.9 crore |
| Early planning filed 20 Jul 2023 | More information requested | 1.4 acres | ₹6.9 crore |
In context
169 applications in Paschim Bardhaman since January 2022 are in the same category (Industry): 81 approved, 49 filed or under review, and 39 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 1.4 acres, this one is smaller than 98% of them.
66 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Mandalpur, Jamuria, Paschim Bardhaman, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Re-Rolling Mill Steel Plant located at R.S. & L.R. Plot No. 2849, 2861,… — more information requested, 0 m away
- Environmental Clearance for Expansion of production capacity from 1,08,000 TPA… — environmental approval granted, 100 m away
- Environmental Clearance for Existing 25,680 TPA Hot Rolling Mill for… — cleared for impact study, 300 m away
- Proposed ISP: Iron Ore Beneficiation Plant (2.8 MTPA), Pelletization Plant (2… — environmental approval granted, 400 m away
- Proposed ISP: Iron Ore Beneficiation Plant (2.8 MTPA), Pelletization Plant (2… — cleared for impact study, 400 m away
- Expansion of Dual Re-Rolling MillPlant located at Plot No. 2966, 2968&… — lapsed, 500 m away
- Expansion of Integrated Steel Plant from 0.85 MTPA to 1.35 MTPA at Jamuria… — more information requested, 600 m away
- Expansion of Integrated Steel Plant from 0.85 MTPA to 1.35 MTPA at Jamuria… — cleared for impact study, 600 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.