One of 2 filings for this project. The project's main page, with every filing and where each stands: Expansion of Integrated Steel Plant from 0.85 MTPA to 1.35 MTPA at Jamuria Industrial…
Project details
| Official title | Expansion of Integrated Steel Plant from 0.85 MTPA to 1.35 MTPA at Jamuria Industrial Estate in Village Mandalpur & Banali, P.O Mondalpur, District Paschim Bardhaman, West Bengal by M/s Super Smelters Limited |
|---|---|
| Status | More information requested |
| Status since | 20 Nov 2026 |
| Application filed | 3 Nov 2026 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Industry |
| Applicant | Super Smelters Limited |
| Land area | 294.8 acres (119.3 ha) |
| Project cost | ₹3,625 crore |
| Village / locality | Banali |
| Taluk / tehsil | Jamuria |
| District | Paschim Bardhaman |
| State | West Bengal |
| Location from | Site boundary on record |
| Our reference | WID-WB-01720 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 3 Nov 2026 (this page) | More information requested | 294.8 acres | ₹3,625 crore |
| Early planning filed 20 Mar 2026 | Cleared for impact study | 294.8 acres | ₹3,625 crore |
In context
169 applications in Paschim Bardhaman since January 2022 are in the same category (Industry): 81 approved, 49 filed or under review, and 39 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 294.8 acres, this one is larger than 86% of them.
64 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Banali, Jamuria, Paschim Bardhaman, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion of Integrated Steel Plant from 0.85 MTPA to 1.35 MTPA at Jamuria… — cleared for impact study, 0 m away
- Application for "No Increase in Pollution Load" Certificate for Change in Raw… — initial checks, 100 m away
- Application of "No Increase in Pollution Load" Certificate for Change in… — initial checks, 100 m away
- Expansion of DRI plant (0.672 to 1.395 MTPA), Pellet Plant (1.2 to 1.8 MTPA),… — environmental approval granted, 100 m away
- Expansion of DRI plant (0.672 to 1.395 MTPA), Pellet Plant (1.2 to 1.8 MTPA),… — cleared for impact study, 100 m away
- No increase in Pollution Load for Proposed change in fuel mix from Coal to… — initial checks, 300 m away
- EC Amendment in Proposed expansion cum modification of 0.85 MTPA Integrated… — environmental approval granted, 300 m away
- Environmental Clearance for Existing 25,680 TPA Hot Rolling Mill for… — cleared for impact study, 350 m away
More from Super Smelters Limited in Paschim Bardhaman
- Application for "No Increase in Pollution Load" Certificate for Change in Raw… — initial checks
- Application of "No Increase in Pollution Load" Certificate for Change in… — initial checks
- Expansion of DRI plant (0.672 to 1.395 MTPA), Pellet Plant (1.2 to 1.8 MTPA),… — environmental approval granted
- No increase in Pollution Load for Proposed change in fuel mix from Coal to… — initial checks
- EC Amendment in Proposed expansion cum modification of 0.85 MTPA Integrated… — environmental approval granted
- Expansion of DRI plant (0.672 to 1.395 MTPA), Pellet Plant (1.2 to 1.8 MTPA),… — cleared for impact study
All 8 Super Smelters projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.