Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 13 Aug 2025 |
| Application filed | 27 May 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Eastern Coalfields LTD |
| Land area | 1,157.4 acres (468.4 ha) |
| Project cost | ₹902.6 crore |
| Village / locality | Dakshinkhanda |
| Taluk / tehsil | Ondal |
| District | Paschim Bardhaman |
| State | West Bengal |
| Location from | Site boundary on record |
| Our reference | WID-WB-00993 |
In context
94 applications in Paschim Bardhaman since January 2022 are in the same category (Mining): 58 approved, 22 filed or under review, and 14 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 1,157.4 acres, this one is larger than 82% of them.
No other mining lease on record is within 500 m of this site; 1 has applied within 5 km.
Where it is
Dakshinkhanda, Ondal, Paschim Bardhaman, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Madhujore Coal Mine — more information requested, 0 m away
- Modification of "Aerotropolis Township" — environmental approval granted, 2 km away
- Modification of "Aerotropolis Township" — cleared for impact study, 2 km away
- Modification of "Aerotropolis Township" — withdrawn, 2.2 km away
- MOIRA UG COAL MINE (0.75 MTPA/ 455.69 Ha) — more information requested, 2.3 km away
- MOIRA UG COAL MINE (0.75 MTPA/ 455.69 Ha) — cleared for impact study, 2.3 km away
- Proposed Group Housing Project of G+13 Storied Residential Building at L.R. &… — under environmental review, 2.6 km away
- Greenfield Steel Project comprising of establishment for Sponge Iron… — under environmental review, 3.8 km away
More from Eastern Coalfields LTD in Paschim Bardhaman
- Girmint-Kd Incline Ug Coal Mine — under environmental review
- MOIRA UG COAL MINE (0.75 MTPA/ 455.69 Ha) — more information requested
- Ratibati Ug Coal Mine — more information requested
- Cluster no. 6 group of 7 UG mines, production capacity 1.25 MTY in ML area of… — lapsed
- Proposed Chinakuri Underground Coal Mine (Target Capacity: 1.0 MTPA, ML area… — lapsed
- Cluster No. 12 (Group of 14 Mines) — under environmental review
20 Eastern Coalfields projects in Paschim Bardhaman
All 28 Eastern Coalfields projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.