Project details
| Status | Under environmental review |
|---|---|
| Status since | 30 Oct 2026 |
| Application filed | 17 Oct 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Aayra Infrastructure |
| Land area | 1.4 acres (0.6 ha) |
| Project cost | ₹40 crore |
| Village / locality | Andal |
| Taluk / tehsil | Ondal |
| District | Paschim Bardhaman |
| State | West Bengal |
| Location from | Site boundary on record |
| Our reference | WID-WB-00640 |
In context
22 applications in Paschim Bardhaman since January 2022 are in the same category (Buildings & townships): 5 approved, 15 filed or under review, and 2 withdrawn, lapsed or rejected. At 1.4 acres, this one is smaller than 95% of them.
11 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Andal, Ondal, Paschim Bardhaman, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Greenfield Steel Project comprising of establishment for Sponge Iron… — under environmental review, 1.7 km away
- Greenfield Steel Project comprising of establishment for Sponge Iron… — cleared for impact study, 1.7 km away
- Modification of "Aerotropolis Township" — environmental approval granted, 1.9 km away
- Modification of "Aerotropolis Township" — cleared for impact study, 1.9 km away
- Modification of "Aerotropolis Township" — withdrawn, 2 km away
- Madhujore Coal Mine — more information requested, 2.6 km away
- Madhujore Coal Mine — cleared for impact study, 2.6 km away
- The Expansion Project of Durgapur Cement Works From the Existing 1.3 Mtpa to… — lapsed, 3.6 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.