Quick answers
What is this project?
Proposed Expansion of Existing Plant by Increasing the Production Capacity of Phenol From 240 Kta to 400 Kta and Acetone From 147 Kta to 248 Kta is a proposed industrial project in Paran Chak, Haldia, Purba Medinipur, West Bengal. The site covers 44.5 acres.
Who is building it?
The applicant is Adplus Chemicals and Polymers Private Limited.
Has it been approved?
Not yet. The application is still under review: its status is “Returned to applicant”, as of 27 Nov 2026.
Where is it?
In Paran Chak, Haldia, Purba Medinipur, West Bengal.
How big is it?
It has a stated cost of ₹4,000 crore and a site of 44.5 acres.
When was it filed?
The application was filed on 5 Nov 2025.
One of 3 filings for this project. The project's main page, with every filing and where each stands: Proposed Expansion of Existing Plant by Increasing the Production Capacity of Phenol…
Project details
| Status | Returned to applicant |
|---|---|
| Status since | 20 Nov 2025 |
| Application filed | 5 Nov 2025 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Industry |
| Applicant | Adplus Chemicals and Polymers Private Limited |
| Land area | 44.5 acres (18 ha) |
| Project cost | ₹4,000 crore |
| Village / locality | Paran Chak |
| Taluk / tehsil | Haldia |
| District | Purba Medinipur |
| State | West Bengal |
| Location from | Site boundary on record |
| Our reference | WID-WB-01229 |
All filings for this project
This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 13 Jan 2026 | Environmental approval granted | 44.5 acres | ₹4,000 crore |
| Expansion filed 5 Nov 2025 (this page) | Returned to applicant | 44.5 acres | ₹4,000 crore |
| Early planning filed 13 Jun 2025 | Cleared for impact study | 44.5 acres | ₹4,000 crore |
In context
27 applications in Purba Medinipur since January 2022 are in the same category (Industry): 12 approved, 11 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 44.5 acres, this one is larger than 56% of them.
29 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Paran Chak, Haldia, Purba Medinipur, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Expansion of Existing Plant by Increasing the Production Capacity of… — environmental approval granted, 0 m away
- Proposed Expansion of Existing Plant by Increasing the Production Capacity of… — cleared for impact study, 0 m away
- Environmental Clearance (EC) for increase in Propylene production through… — application filed, 900 m away
- Environmental Clearance (EC) for increase in Propylene production through… — returned to applicant, 900 m away
- Environmental Clearance for Increase in Propylene, Phenol and Acetone (within… — environmental approval granted, 950 m away
- Environmental Clearance for Increase in Propylene, Phenol and Acetone (within… — environmental approval granted, 950 m away
- Environmental Clearance for Increase in Propylene, Phenol and Acetone (within… — environmental approval granted, 950 m away
- Environmental Clearance (Ec) Amendment for Increasing Propylene Production… — lapsed, 950 m away
All 3 Adplus Chemicals and projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.