What is Developing? Open the mapMap

Environmental approval grantedIndustry · Purba Medinipur, West Bengal

Proposed Expansion of Existing Plant by Increasing the Production Capacity of Phenol From 240 Kta to 400 Kta and Acetone From 147 Kta to 248 Kta.

Proposed Expansion of Existing Plant by Increasing the Production Capacity of Phenol From 240 Kta to 400 Kta and Acetone From 147 Kta to 248 Kta is an approved industrial project in Paran Chak, Haldia, Purba Medinipur, West Bengal. The site covers 44.5 acres. Its stated project cost is ₹4,000 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 2 Mar 2026).

See it on the live map All projects in Purba Medinipur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed Expansion of Existing Plant by Increasing the Production Capacity of Phenol From 240 Kta to 400 Kta and Acetone From 147 Kta to 248 Kta is an approved industrial project in Paran Chak, Haldia, Purba Medinipur, West Bengal. The site covers 44.5 acres.

Who is building it?

The applicant is Adplus Chemicals and Polymers Private Limited.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 2 Mar 2026), as of 27 Nov 2026.

Where is it?

In Paran Chak, Haldia, Purba Medinipur, West Bengal.

How big is it?

It has a stated cost of ₹4,000 crore and a site of 44.5 acres.

When was it filed?

The application was filed on 13 Jan 2026.

Project details

StatusEnvironmental approval granted
Status since2 Mar 2026
Application filed13 Jan 2026
Approval soughtEnvironmental approval
Application typeExpansion
SectorIndustry
ApplicantAdplus Chemicals and Polymers Private Limited
Land area44.5 acres (18 ha)
Project cost₹4,000 crore
Village / localityParan Chak
Taluk / tehsilHaldia
DistrictPurba Medinipur
StateWest Bengal
Location fromSite boundary on record
Our referenceWID-WB-01603

All filings for this project

This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Expansion filed 13 Jan 2026 (this page)Environmental approval granted44.5 acres₹4,000 crore
Expansion filed 5 Nov 2025Returned to applicant44.5 acres₹4,000 crore
Early planning filed 13 Jun 2025Cleared for impact study44.5 acres₹4,000 crore

In context

27 applications in Purba Medinipur since January 2022 are in the same category (Industry): 12 approved, 11 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 44.5 acres, this one is larger than 56% of them.

29 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Paran Chak, Haldia, Purba Medinipur, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

All 3 Adplus Chemicals and projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.