Project details
| Official title | Enhancement of MS Ingots/ Billets production from 61,800 TPA to 157,620 TPA along with 2 Strand 4/7m CCM, Installation of 460 TPD Rolling Mill for production of 152,000 TPA Rolled Products, Enhancement of Slag Crusher unit from 3600 TPA to 10800 TPA and installation of Alumino-thermite Plant for production of 3,600 TPA Low Carbon Fe-Mn by M/s Sumangal Ispat Private Ltd at Village: Hetedoba, P.O. Ichapur, District: Paschim Bardhaman, State West Bengal. |
|---|---|
| Status | Cleared for impact study |
| Status since | 26 Jun 2025 |
| Application filed | 21 Jun 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Sumangal Ispat Private Limited |
| Land area | 8.9 acres (3.6 ha) |
| Project cost | ₹96.3 crore |
| Village / locality | Hetedoba |
| Taluk / tehsil | Faridpur Durgapur |
| District | Paschim Bardhaman |
| State | West Bengal |
| Location from | Site boundary on record |
| Our reference | WID-WB-01326 |
In context
169 applications in Paschim Bardhaman since January 2022 are in the same category (Industry): 81 approved, 49 filed or under review, and 39 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 8.9 acres, this one is smaller than 83% of them.
9 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Hetedoba, Faridpur Durgapur, Paschim Bardhaman, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Hot & Cold Rolling Mill Plant at Plot No.220 (Full), 221 (P) & 222 (P), Nachan… — lapsed, 1.6 km away
- Hot & Cold Rolling Mill Plant at Plot No.220 (Full), 221 (P) & 222 (P), Nachan… — cleared for impact study, 1.6 km away
- Proposed expansion of existing steel plant consisting of 2x12T Induction… — lapsed, 2.7 km away
- Proposed Expansion of Ferro Alloy Plant by Installing 1 X 6.5 MVA Submerged… — under environmental review, 3.6 km away
- Proposed Expansion of Ferro Alloy Plant by Installing 1 X 6.5 MVA Submerged… — cleared for impact study, 3.6 km away
- Proposed Expansion of Ferro Alloy Plant By Installing 1 X 6.5 MVA Submerged… — returned to applicant, 3.6 km away
- 4x6 Tonnes Induction Furnaces — cleared for impact study, 4 km away
- Additional installation of 1x6 T Induction Furnace for expansion of MS Billet… — cleared for impact study, 4.1 km away