Quick answers
What is Duberdanga Black Stone Deposit of Sri Uttam Kesh?
Duberdanga Black Stone Deposit of Sri Uttam Kesh is an approved mining project in Khosbag, Gangajalghati, Bankura, West Bengal. The site covers 5.4 acres.
Who is building it?
The applicant is Uttam Kesh.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 10 Jul 2025), as of 27 Nov 2026.
Where is it?
In Khosbag, Gangajalghati, Bankura, West Bengal.
How big is it?
It has a stated cost of ₹50 lakh and a site of 5.4 acres.
When was it filed?
The application was filed on 17 Apr 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 10 Jul 2025 |
| Application filed | 17 Apr 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Uttam Kesh |
| Land area | 5.4 acres (2.2 ha) |
| Project cost | ₹50 lakh |
| Village / locality | Khosbag |
| Taluk / tehsil | Gangajalghati |
| District | Bankura |
| State | West Bengal |
| Location from | Site boundary on record |
| Our reference | WID-WB-01335 |
In context
216 applications in Bankura since January 2022 are in the same category (Mining): 146 approved, 54 filed or under review, and 16 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 5.4 acres, this one is smaller than 84% of them.
No other mining lease on record is within 500 m of this site; 4 have applied within 5 km.
Where it is
Khosbag, Gangajalghati, Bankura, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Barsal Shrirampur & Duberdanga Blackstone Mine — environmental approval granted, 1.2 km away
- Proposed Steel & Alloy Plant by Installation of 8 x 18 MVA SEAF, Electric Arc… — more information requested, 2.6 km away
- Proposed Steel & Alloy Plant by Installation of 8 x 18 MVA SEAF, Electric Arc… — returned to applicant, 2.6 km away
- Greenfield steel Plant for production of 426000 TPA (max) ferro alloys, 260000… — under environmental review, 2.6 km away
- Proposed Steel Plant by Installation of 8 x 18 MVA SEAF, Electric Arc Furnace… — lapsed, 2.7 km away
- Greenfield Project with Installation of 2 x 9 MVA Submerged Arc Furnace (SAF)… — environmental approval granted, 3.9 km away
- Proposed 3X9 MVA Ferro Alloy plant and 30 TPD Sinter Plant — under environmental review, 4.3 km away
- Proposed 3X9 MVA Ferro Alloy plant and 30 TPD Sinter Plant — more information requested, 4.3 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.