Cleared for impact studyIndustry · Bankura, West Bengal

Expansion in Steel Plant for Increasing Capacity of Sms Unit From 180805 Tpa to 524000 Tpa for Production of M.S Billets Having Existing 2x20 Tonnes If With 3 Strand 4/7 Ccm Also Replacing Existing 2x8 Tonnes If With 20 Tonnes If by Adding 5x20 Tonnes If With 3 Strand 5/9 M Ccm, Rolling Mill From 1,48,800 Tpa to 4,97,800 Tpa With Additional Facilities for Production of Sponge Iron of 577500 Tpa With 5x350 Tpd Dri Rotary Kiln, Cpp of 70 MW (Whrb#50 MW + Afbc#20 MW) and Slag Crusher of 50 Tph

Expansion in Steel Plant for Increasing Capacity of Sms Unit From 180805 Tpa to 524000 Tpa for Production of M.S Billets Having Existing 2x20 Tonnes If With 3 Strand 4/7 Ccm Also Replacing Existing 2x8 Tonnes If With 20 Tonnes If by Adding 5x20 Tonnes If With 3 Strand 5/9 M Ccm, Rolling Mill From 1,48,800 Tpa to 4,97,800 Tpa With Additional Facilities for Production of Sponge Iron of 577500 Tpa With 5x350 Tpd Dri Rotary Kiln, Cpp of 70 MW (Whrb#50 MW + Afbc#20 MW) and Slag Crusher of 50 Tph is a proposed industrial project in Kamarkata, Gangajalghati, Bankura, West Bengal. The site covers 66.6 acres. Its stated project cost is ₹656.2 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 5 Apr 2025).

See it on the live map All projects in Bankura

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Expansion in Steel Plant for Increasing Capacity of Sms Unit From 180805 Tpa to 524000 Tpa for Production of M.S Billets Having Existing 2x20 Tonnes If With 3 Strand 4/7 Ccm Also Replacing Existing 2x8 Tonnes If With 20 Tonnes If by Adding 5x20 Tonnes If With 3 Strand 5/9 M Ccm, Rolling Mill From 1,48,800 Tpa to 4,97,800 Tpa With Additional Facilities for Production of Sponge Iron of 577500 Tpa With 5x350 Tpd Dri Rotary Kiln, Cpp of 70 MW (Whrb#50 MW + Afbc#20 MW) and Slag Crusher of 50 Tph is a proposed industrial project in Kamarkata, Gangajalghati, Bankura, West Bengal. The site covers 66.6 acres.

Who is building it?

The applicant is Shree Ramdoot Rollers PVT LTD.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 5 Apr 2025), as of 27 Nov 2026.

Where is it?

In Kamarkata, Gangajalghati, Bankura, West Bengal.

How big is it?

It has a stated cost of ₹656.2 crore and a site of 66.6 acres.

When was it filed?

The application was filed on 28 Mar 2025.

Project details

StatusCleared for impact study
Status since5 Apr 2025
Application filed28 Mar 2025
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantShree Ramdoot Rollers PVT LTD
Land area66.6 acres (27 ha)
Project cost₹656.2 crore
Village / localityKamarkata
Taluk / tehsilGangajalghati
DistrictBankura
StateWest Bengal
Location fromSite boundary on record
Our referenceWID-WB-01337

In context

69 applications in Bankura since January 2022 are in the same category (Industry): 29 approved, 23 filed or under review, and 17 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 66.6 acres, this one is larger than 80% of them.

14 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Kamarkata, Gangajalghati, Bankura, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Shree Ramdoot Rollers PVT LTD in Bankura

All 6 Shree Ramdoot Rollers projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.