What is Developing? Open the mapMap

Initial checksBuildings & townships · Purba Bardhaman, West Bengal

Expansion of Grain Based Ethanol Plant From 150 Klpd to 190 Klpd by Enabling Usage of Broken Rice/Maize, Modernization in Fermentation Technology and Change in Process Parameter to Achieve Higher Alcohol Production Within the Existing Plant Under Ministry's Notification Dated 02nd March, 2021

Expansion of Grain Based Ethanol Plant From 150 Klpd to 190 Klpd by Enabling Usage of Broken Rice/Maize, Modernization in Fermentation Technology and Change in Process Parameter to Achieve Higher Alcohol Production Within the Existing Plant Under Ministry's Notification Dated 02nd March, 2021 is a proposed industrial building project in Belari, Ausgram - I, Purba Bardhaman, West Bengal. The site covers 18.9 acres. Its stated project cost is ₹196.9 crore. As of 27 Nov 2026, its status is “Initial checks” (since 3 Oct 2025).

See it on the live map All projects in Purba Bardhaman

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Expansion of Grain Based Ethanol Plant From 150 Klpd to 190 Klpd by Enabling Usage of Broken Rice/Maize, Modernization in Fermentation Technology and Change in Process Parameter to Achieve Higher Alcohol Production Within the Existing Plant Under Ministry's Notification Dated 02nd March, 2021 is a proposed industrial building project in Belari, Ausgram - I, Purba Bardhaman, West Bengal. The site covers 18.9 acres.

Who is building it?

The applicant is Sterling Distillers Private Limited.

Has it been approved?

Not yet. The application is still under review: its status is “Initial checks”, as of 27 Nov 2026.

Where is it?

In Belari, Ausgram - I, Purba Bardhaman, West Bengal.

How big is it?

It has a stated cost of ₹196.9 crore and a site of 18.9 acres.

When was it filed?

The application was filed on 3 Oct 2025.

Project details

Official titleExpansion of Grain Based Ethanol Plant From 150 Klpd to 190 Klpd by Enabling Usage of Broken Rice/Maize, Modernization in Fermentation Technology and Change in Process Parameter to Achieve Higher Alcohol Production Within the Existing Plant Under Ministry's Notification Dated 02nd March, 2021 at Village Belari, Tehsil Ausgram – I, District Purba Bardhaman, West Bengal by M/S. Sterling Distillers Private Limited
StatusInitial checks
Status since3 Oct 2025
Application filed3 Oct 2025
Approval soughtEnvironmental approval
Application typeNew project
SectorBuildings & townships
ApplicantSterling Distillers Private Limited
UseIndustrial
Land area18.9 acres (7.6 ha)
Plot area76,400 m² (8,22,362 sq ft)
Project cost₹196.9 crore
Village / localityBelari
Taluk / tehsilAusgram - I
DistrictPurba Bardhaman
StateWest Bengal
Location fromSite boundary on record
Our referenceWID-WB-01401

In context

5 applications in Purba Bardhaman since January 2022 are in the same category (Buildings & townships): 3 approved, 1 filed or under review, and 1 withdrawn, lapsed or rejected.

6 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Belari, Ausgram - I, Purba Bardhaman, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Sterling Distillers Private Limited in Purba Bardhaman

All 4 Sterling Distillers projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.