What is Developing? Open the mapMap

Environmental approval grantedIndustry · Paschim Bardhaman, West Bengal

Expansion of DRI plant (0.672 to 1.395 MTPA), Pellet Plant (1.2 to 1.8 MTPA), IF (0.712 to 0.87733 MTPA) with EAF; SAF (0.0908 to 0.148 MTPA) with proposed 2X10 T EAF, 1 x 35 T AOD, 35 TPH Briquetting plant, CPP-WHRB (51 to 102 MW), existing rolling mill (0.85 MTPA) & oxygen plant (3600 m3/hr); decreasing capacity of Coal washery (0.9 to 0.6 MTPA), Iron ore beneficiation (2 to 1.1 MTPA) & CPP- FBC (133 to 72 MW) alongwith dropping of unimplemented Sinter plant, MBF, Lime Plant, AOD & Coke Oven

Expansion of DRI plant (0.672 to 1.395 MTPA), Pellet Plant (1.2 to 1.8 MTPA), IF (0.712 to 0.87733 MTPA) with EAF; SAF (0.0908 to 0.148 MTPA) with proposed 2X10 T EAF, 1 x 35 T AOD, 35 TPH Briquetting plant, CPP-WHRB (51 to 102 MW), existing rolling mill (0.85 MTPA) & oxygen plant (3600 m3/hr); decreasing capacity of Coal washery (0.9 to 0.6 MTPA), Iron ore beneficiation (2 to 1.1 MTPA) & CPP- FBC (133 to 72 MW) alongwith dropping of unimplemented Sinter plant, MBF, Lime Plant, AOD & Coke Oven is an approved industrial project in Banali, Jamuria, Paschim Bardhaman, West Bengal. The site covers 224.8 acres. Its stated project cost is ₹3,135 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 4 Oct 2025).

See it on the live map All projects in Paschim Bardhaman

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

StatusEnvironmental approval granted
Status since4 Oct 2025
Application filed28 Jul 2025
Approval soughtEnvironmental approval
Application typeExpansion
SectorIndustry
ApplicantSuper Smelters Limited
Land area224.8 acres (91 ha)
Project cost₹3,135 crore
Village / localityBanali
Taluk / tehsilJamuria
DistrictPaschim Bardhaman
StateWest Bengal
Location fromSite boundary on record
Our referenceWID-WB-01430

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Expansion filed 28 Jul 2025 (this page)Environmental approval granted224.8 acres₹3,135 crore
Early planning filed 9 Oct 2024Cleared for impact study224.8 acres₹3,135 crore

In context

169 applications in Paschim Bardhaman since January 2022 are in the same category (Industry): 81 approved, 49 filed or under review, and 39 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 224.8 acres, this one is larger than 84% of them.

64 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Banali, Jamuria, Paschim Bardhaman, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Super Smelters Limited in Paschim Bardhaman

All 8 Super Smelters projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.