One of 2 filings for this project. The project's main page, with every filing and where each stands: Expansion-cum-modification of existing integrated steel plant located at Industrial…
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 18 Jul 2025 |
| Application filed | 10 Jul 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Ramsarup Industries Limited |
| Land area | 315 acres (127.5 ha) |
| Project cost | ₹1,091.6 crore |
| Village / locality | Chak Sanadhar |
| Taluk / tehsil | Kharagpur - I |
| District | Medinipur West |
| State | West Bengal |
| Location from | Site boundary on record |
| Our reference | WID-WB-01463 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Amendment filed 27 Jul 2026 | Cleared for impact study | 315 acres | ₹4,755.1 crore |
| Early planning filed 10 Jul 2025 (this page) | Cleared for impact study | 315 acres | ₹1,091.6 crore |
In context
43 applications in Medinipur West since January 2022 are in the same category (Industry): 27 approved, 10 filed or under review, and 6 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 315 acres, this one is larger than 60% of them.
24 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Chak Sanadhar, Kharagpur - I, Medinipur West, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion-cum-modification of existing integrated steel plant located at… — lapsed, 0 m away
- Application for "no Increase in Pollution Load" Certificate for Increasing of… — initial checks, 0 m away
- Expansion-cum-modification of existing integrated steel plant located at… — cleared for impact study, 0 m away
- Modernization-cum-expansion of Integrated Steel Plant (0.3 MTPA to 0.7 MTPA)… — environmental approval granted, 0 m away
- Proposed Expansion-cum-Modification of existing steel plant at Industrial… — withdrawn, 150 m away
- Expansion of Integrated Steel Plant from 2.0 million TPA with 385 MW CPP to… — initial checks, 900 m away
- Proposed expansion of Integrated Steel Plant 4.2 million TPA (Finished Steel) — returned to applicant, 1.1 km away
- Expansion of Integrated Steel Plant; Mbf –(5,00,000 Tpa to 5,50,000 Tpa) &… — environmental approval granted, 1.1 km away
More from Ramsarup Industries Limited in Medinipur West
- Expansion-cum-modification of existing integrated steel plant located at… — lapsed
- Application for "no Increase in Pollution Load" Certificate for Increasing of… — initial checks
- Modernization-cum-expansion of Integrated Steel Plant (0.3 MTPA to 0.7 MTPA)… — environmental approval granted
- Proposed Expansion-cum-Modification of existing steel plant at Industrial… — withdrawn
All 6 Ramsarup Industries projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.