Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 10 Feb 2025 |
| Application filed | 27 Nov 2024 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Industry |
| Applicant | Rashmi Metaliks Limited |
| Land area | 144 acres (58.3 ha) |
| Project cost | ₹1,445 crore |
| Village / locality | Teghari |
| Taluk / tehsil | Kharagpur - I |
| District | Medinipur West |
| State | West Bengal |
| Location from | Site boundary on record |
| Our reference | WID-WB-00524 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 27 Nov 2024 (this page) | Environmental approval granted | 144 acres | ₹1,445 crore |
| Early planning filed 30 Oct 2023 | Cleared for impact study | 144 acres | ₹1,445 crore |
In context
43 applications in Medinipur West since January 2022 are in the same category (Industry): 27 approved, 10 filed or under review, and 6 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 144 acres, this one is smaller than 51% of them.
25 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Teghari, Kharagpur - I, Medinipur West, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion of Integrated Steel Plant; Mbf –(5,00,000 Tpa to 5,50,000 Tpa) &… — cleared for impact study, 0 m away
- Expansion of Integrated Steel Plant from 2.0 million TPA with 385 MW CPP to… — initial checks, 800 m away
- Proposed Expansion-cum-Modification of existing steel plant at Industrial… — withdrawn, 1 km away
- Assessment of No Increase in Pollution Load for product mix (Titanium Slag @… — initial checks, 1.1 km away
- Assessment of No Increase in Pollution Load for Product Mix in Beneficiation… — initial checks, 1.1 km away
- Expansion-cum-modification of existing integrated steel plant located at… — cleared for impact study, 1.1 km away
- Expansion-cum-modification of existing integrated steel plant located at… — lapsed, 1.1 km away
- Expansion-cum-modification of existing integrated steel plant located at… — cleared for impact study, 1.1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.