Quick answers
What is this project?
Amendment in Environment Clearance w.r.t. Thermal Power Plant located at JL – 94, Mouza – Kismatsibrampur, JL No. – 170, Mouza – Tentulberia, JL No. – 147, Mouza – Sovarampur, JL No. 146, Mouza – Kashbere, PS – Bhabanipur, Haldia, East Medinipur, West Bengal by M/s Hiranmaye Energy Limited for review of SO2 emission standards and exemption from installation of Flue Gas Desulfurization (FGD) as per MoEF&CC, New Delhi's Notification dated 11.07.2025 is an approved power project in Kasbere, Haldia, Purba Medinipur, West Bengal. The site covers 510.6 acres.
Who is building it?
The applicant is Hiranmaye Energy Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 13 Aug 2026), as of 27 Nov 2026.
Where is it?
In Kasbere, Haldia, Purba Medinipur, West Bengal.
How big is it?
It has a stated cost of ₹2,020.9 crore and a site of 510.6 acres.
When was it filed?
The application was filed on 6 Feb 2026.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 13 Aug 2026 |
| Application filed | 6 Feb 2026 |
| Approval sought | Environmental approval |
| Application type | Amendment |
| Sector | Power |
| Applicant | Hiranmaye Energy Limited |
| Land area | 510.6 acres (206.6 ha) |
| Project cost | ₹2,020.9 crore |
| Village / locality | Kasbere |
| Taluk / tehsil | Haldia |
| District | Purba Medinipur |
| State | West Bengal |
| Location from | Site boundary on record |
| Our reference | WID-WB-01602 |
In context
30 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kasbere, Haldia, Purba Medinipur, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Environmental Clearance (Ec) Amendment for Increasing Propylene Production… — lapsed, 1.9 km away
- Environmental Clearance for Increase in Propylene, Phenol and Acetone (within… — environmental approval granted, 1.9 km away
- Environmental Clearance for Increase in Propylene, Phenol and Acetone (within… — environmental approval granted, 1.9 km away
- Environmental Clearance for Increase in Propylene, Phenol and Acetone (within… — environmental approval granted, 1.9 km away
- Environmental Clearance (EC) for increase in Propylene production through… — application filed, 1.9 km away
- Environmental Clearance (EC) for increase in Propylene production through… — returned to applicant, 1.9 km away
- Aaa — under environmental review, 1.9 km away
- Proposed Expansion of Existing Plant by Increasing the Production Capacity of… — environmental approval granted, 2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.