What is Developing? Open the mapMap

Under environmental reviewIndustry · Paschim Bardhaman, West Bengal

Expansion of existing EC by enhancing Ammonia & Urea production capacity through revision of Phase-II capacities while retaining existing operational Phase-I plant & new installation of Technical Ammonium Nitrate plant with Nitric acid plant, establishment of Chemical Cluster

Expansion of existing EC by enhancing Ammonia & Urea production capacity through revision of Phase-II capacities while retaining existing operational Phase-I plant & new installation of Technical Ammonium Nitrate plant with Nitric acid plant, establishment of Chemical Cluster is a proposed industrial project in Kota Chandipur, Ausgram - Ii, Paschim Bardhaman, West Bengal. The site covers 499 acres. Its stated project cost is ₹19,777 crore. As of 27 Nov 2026, its status is “Under environmental review” (since 6 Oct 2026).

See it on the live map All projects in Paschim Bardhaman

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

Official titleExpansion of existing EC by enhancing Ammonia & Urea production capacity through revision of Phase-II capacities while retaining existing operational Phase-I plant & new installation of Technical Ammonium Nitrate plant with Nitric acid plant, establishment of Chemical Cluster along with Cogeneration Power Plant, Grain-based Distillery along with Bioethanol Downstream Products at Panagarh Industrial Park, Panagarh, Kanksa Block, District Purba Bardhaman, West Bengal
StatusUnder environmental review
Status since6 Oct 2026
Application filed28 Aug 2026
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantMatix Fertilisers and Chemicals Limited
Land area499 acres (201.9 ha)
Project cost₹19,777 crore
Village / localityKota Chandipur
Taluk / tehsilAusgram - Ii
DistrictPaschim Bardhaman
StateWest Bengal
Location fromSite boundary on record
Our referenceWID-WB-01725

In context

169 applications in Paschim Bardhaman since January 2022 are in the same category (Industry): 81 approved, 49 filed or under review, and 39 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 499 acres, this one is larger than 90% of them.

16 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Kota Chandipur, Ausgram - Ii, Paschim Bardhaman, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Matix Fertilisers and Chemicals Limited in Paschim Bardhaman

All 7 Matix Fertilisers and projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.