Quick answers
What is this project?
Greenfield Project of Automatic Oil Distillation Unit of Capacity 50,000 TPA (30,000 TPA from Crude Oil and 20,000 TPA from Used Oil located at Mouza: Barasuli, Tehsil - Jhargram, District - Jhargram Pin -721517, West Bengal by M/s SAPL Lubricants and Fuels LLP is a proposed industrial project in Barasuli, Jhargram, West Bengal. The site covers 4.5 acres.
Who is building it?
The applicant is Sapl Lubricants & Fuels LLP.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 12 Oct 2026), as of 27 Nov 2026.
Where is it?
In Barasuli, Jhargram, West Bengal.
How big is it?
It has a stated cost of ₹15.5 crore and a site of 4.5 acres.
When was it filed?
The application was filed on 21 Sept 2026.
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 12 Oct 2026 |
| Application filed | 21 Sept 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Sapl Lubricants & Fuels LLP |
| Land area | 4.5 acres (1.8 ha) |
| Project cost | ₹15.5 crore |
| Village / locality | Barasuli |
| Taluk / tehsil | Jhargram |
| District | Jhargram |
| State | West Bengal |
| Location from | Site boundary on record |
| Our reference | WID-WB-01814 |
In context
9 applications in Jhargram since January 2022 are in the same category (Industry): 4 approved, 4 filed or under review, and 1 withdrawn, lapsed or rejected.
5 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Barasuli, Jhargram, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Assessment of No Increase in Pollution Load for Product Mix in Beneficiation… — initial checks, 2.9 km away
- No Increase in Pollution Load for Enhancement in Production Capacity of… — initial checks, 3.2 km away
- Splitting of Environment Clearance-800000TPA DRI(10x100+350+600TPD),43MW WHRB… — lapsed, 3.2 km away
- Expansion of the Sponge Iron Plant from 58,500 TPA to 130,350 TPA by… — under environmental review, 4.3 km away
- Dalkati and Adjoining Moujas Pwss(Sm/12357) — lapsed, 4.3 km away
- Pindrakuli and Adjoining Moujas Pwss — lapsed, 7.5 km away
- Drawal of 11 KV Line for Phe Connection at Chakua Under Jhargram Ccc — lapsed, 7.8 km away
- Hudhudi Stand Alone Units For Drought Like Situation Prone 8 Blocks Of… — lapsed, 8 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.