Quick answers
What is this project?
Drawal of 11 KV Line for Phe Connection at Chakua Under Jhargram Ccc is a lapsed water and irrigation project in Kenudi Sol, Jhargram, West Bengal. The site covers 0.5 acres.
Who is building it?
The applicant is West Bengal State Electricity Distribution Company Limited.
Has it been approved?
No. The application was lapsed on 24 Sept 2026, so it is no longer under consideration.
Where is it?
In Kenudi Sol, Jhargram, West Bengal.
How big is it?
It has a stated cost of ₹1 lakh; a site of 0.5 acres and 2,000 m² of forest land.
When was it filed?
The application was filed on 13 Dec 2024.
Project details
| Status | Lapsed |
|---|---|
| Status since | 24 Sept 2026 |
| Application filed | 13 Dec 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Water & irrigation |
| Applicant | West Bengal State Electricity Distribution Company Limited |
| Land area | 2,000 m² |
| Forest land | 2,000 m² |
| Project cost | ₹1 lakh |
| Village / locality | Kenudi Sol |
| Taluk / tehsil | Jhargram |
| District | Jhargram |
| State | West Bengal |
| Location from | Site boundary on record |
| Our reference | WID-WB-02053 |
In context
45 applications in Jhargram since January 2022 are in the same category (Water & irrigation): 0 approved, 0 filed or under review, and 45 withdrawn, lapsed or rejected. At 0.5 acres, this one is smaller than 96% of them.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kenudi Sol, Jhargram, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Pindrakuli and Adjoining Moujas Pwss — lapsed, 4.1 km away
- Assessment of No Increase in Pollution Load for Product Mix in Beneficiation… — initial checks, 5.2 km away
- No Increase in Pollution Load for Enhancement in Production Capacity of… — initial checks, 5.5 km away
- Splitting of Environment Clearance-800000TPA DRI(10x100+350+600TPD),43MW WHRB… — lapsed, 5.5 km away
- Expansion of the Sponge Iron Plant from 58,500 TPA to 130,350 TPA by… — under environmental review, 6 km away
- Greenfield Project of Automatic Oil Distillation Unit of Capacity 50,000 TPA… — cleared for impact study, 7.8 km away
- Hudhudi Stand Alone Units For Drought Like Situation Prone 8 Blocks Of… — lapsed, 9.3 km away
- Drawal of New 11 KV Kapgari Feeder — lapsed, 11.1 km away
More from West Bengal State Electricity Distribution Company Limited in Jhargram
- Drawal of New 11 KV Kapgari Feeder — lapsed
All 10 West Bengal State projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.