Quick answers
What is this project?
Dredging/Desilting of Rupnarayan River under "No cost to State Exchequer" model for a length of 19.0 km from Buxi to Denan in Mouzas - Jossar, Panchuganj, Maluda, Naguriya, Maroberiya,…. within Block – Kolaghat, Bagnan-I, Bagnan-II and Amta-II, District – Purba Medinipur and Howrah, State – West Bengal by M/s. Reach Dredging Limited is a rejected port and coastal project in Naya Chak, Bagnan - Ii, Howrah, West Bengal. The site covers 3,076.5 acres.
Who is building it?
The applicant is Reach Dredging Limited.
Has it been approved?
No. The application was rejected on 21 Apr 2026.
Where is it?
In Naya Chak, Bagnan - Ii, Howrah, West Bengal.
How big is it?
It has a stated cost of ₹9.9 crore and a site of 3,076.5 acres.
When was it filed?
The application was filed on 9 Feb 2026.
Project details
| Status | Not approved |
|---|---|
| Status since | 21 Apr 2026 |
| Application filed | 9 Feb 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Ports & coast |
| Applicant | Reach Dredging Limited |
| Land area | 3,076.5 acres (1,245 ha) |
| Project cost | ₹9.9 crore |
| Village / locality | Naya Chak |
| Taluk / tehsil | Bagnan - Ii |
| District | Howrah |
| State | West Bengal |
| Location from | Site boundary on record |
| Our reference | WID-WB-01883 |
In context
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Naya Chak, Bagnan - Ii, Howrah, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Environment Clearance for Cast Iron Casting Unit at Mouza-Barunda, Madhya… — environmental approval granted, 4.5 km away
- Environment Clearance for Cast Iron Casting Unit at Mouza-Barunda, Madhya… — cleared for impact study, 4.5 km away
- Regularization of Environmental Clearance for Expansion of Existing Rolling… — not approved, 11 km away
- Increase in production capacity of existing installed facilities by… — more information requested, 12.1 km away
- Increase in Production Capacity of Existing Installed Facilities by… — environmental approval granted, 12.1 km away
- Increase in Production Capacity of Existing Installed Facilities by… — environmental approval granted, 12.1 km away
- Proposed corrigendum of EC vide EC Identification No: EC25B008WB171799, File… — environmental approval granted, 12.2 km away
- Expansion of Resins (Solid) manufacturing from 5,520 TPA to 17503 TPA &… — environmental approval granted, 14.2 km away
All 4 Reach Dredging projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.