Project details
| Status | More information requested |
|---|---|
| Status since | 19 Nov 2026 |
| Application filed | 5 Dec 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Telecom |
| Applicant | Bharti Airtel Limited |
| Land area | 3.2 acres (1.3 ha) |
| Forest land | 2.2 acres (0.9 ha) |
| Project cost | ₹1.7 crore |
| Village / locality | Forest Mazeok |
| Taluk / tehsil | Kalimpong -I |
| District | Kalimpong |
| State | West Bengal |
| Location from | Site boundary on record |
| Our reference | WID-WB-01944 |
In context
19 applications in Kalimpong since January 2022 are in the same category (Telecom): 8 approved, 7 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 7 months from filing to approval. At 3.2 acres, this one is larger than 94% of them.
13 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Forest Mazeok, Kalimpong -I, Kalimpong, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed 0.0163 Ha Land to Be Diverted Gravity Based Piped Water Supply Scheme… — more information requested, 2.6 km away
- Laying of Proposed 12 Ø (Carbon steel) Natural Gas Pipeline — not approved, 2.7 km away
- Jal Jeevan Misison (Jjm) Scheme for Proposed Gravity Based and Pumping Based… — forest land use approved, 2.7 km away
- Laying of Proposed 12 Ø (Carbon steel) Natural Gas Pipeline — lapsed, 2.8 km away
- Proposed 0.0959 Haland to Be Diverted for Proposed Gravity Based and Pumping… — forest land use approved, 2.9 km away
- Approach Road to proposed Lolaygaon 66KV Sub-station under Kalimpong District — lapsed, 3.4 km away
- Approach Road to proposed Lolaygaon 66KV Sub-station under Kalimpong District — forest land use approved, 3.4 km away
- PWS Scheme — lapsed, 3.9 km away
All 485 Bharti Airtel (Airtel) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.