What is Developing? Open the mapMap

Not approvedPipelines · Kalimpong, West Bengal

Laying of Proposed 12 Ø (Carbon steel) Natural Gas Pipeline

Laying of Proposed 12 Ø (Carbon steel) Natural Gas Pipeline is a rejected pipeline project in Rissium Forest, Kalimpong - Ii, Kalimpong, West Bengal. The site covers 17.3 acres. Its stated project cost is ₹9 lakh. As of 27 Nov 2026, its status is “Not approved” (since 30 Jul 2024).

See it on the live map All projects in Kalimpong

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

Official titleLaying of Proposed 12 Ø (Carbon steel) Natural Gas Pipeline along with OFC Conduit From Siliguri to Gangtok (WB)
StatusNot approved
Status since30 Jul 2024
Application filed28 Jul 2024
Approval soughtForest land use
Application typeNew project
SectorPipelines
ApplicantIndradhanush Gas Grid Limited
Land area17.3 acres (7 ha)
Forest land17.3 acres (7 ha)
Project cost₹9 lakh
Village / localityRissium Forest
Taluk / tehsilKalimpong - Ii
DistrictKalimpong
StateWest Bengal
Location fromSite boundary on record
Our referenceWID-WB-02239

In context

9 applications in Kalimpong since January 2022 are in the same category (Pipelines): 0 approved, 2 filed or under review, and 7 withdrawn, lapsed or rejected.

9 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Rissium Forest, Kalimpong - Ii, Kalimpong, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Indradhanush Gas Grid Limited in Kalimpong

7 Indradhanush Gas Grid projects in Kalimpong
All 39 Indradhanush Gas Grid projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.