Quick answers
What is this project?
Proposal for Tower construction under BOP/BIP Project at Sankosh Camp_Outside BOP Land (SSB, Frontier HQ, Siliguri) is a proposed telecom project in Dhumpara Forest, Kumargram, Alipurduar, West Bengal. The site covers 0 acres.
Who is building it?
The applicant is Mahesh Nair.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Dhumpara Forest, Kumargram, Alipurduar, West Bengal.
How big is it?
It has a stated cost of ₹1 crore; a site of 0 acres and 200 m² of forest land.
When was it filed?
The application was filed on 23 Mar 2025.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposal for Tower construction under BOP/BIP Project at Sankosh Camp_Outside BOP Land…
Project details
| Status | More information requested |
|---|---|
| Status since | 3 Nov 2026 |
| Application filed | 23 Mar 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Telecom |
| Applicant | Mahesh Nair |
| Land area | 200 m² |
| Forest land | 200 m² |
| Project cost | ₹1 crore |
| Village / locality | Dhumpara Forest |
| Taluk / tehsil | Kumargram |
| District | Alipurduar |
| State | West Bengal |
| Location from | Site boundary on record |
| Our reference | WID-WB-01965 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 23 Mar 2025 (this page) | More information requested | 0 acres | ₹1 crore |
| New project filed 5 Sept 2024 | Decision issued | 0 acres | ₹1 crore |
In context
42 applications in Alipurduar since January 2022 are in the same category (Telecom): 5 approved, 8 filed or under review, and 23 withdrawn, lapsed or rejected. The approved ones took a median of 21 months from filing to approval. At 0 acres, this one is smaller than 100% of them.
5 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Dhumpara Forest, Kumargram, Alipurduar, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposal for Tower construction under BOP/BIP Project at Sankosh Camp_Outside… — decision issued, 0 m away
- BOP Sankosh — under wildlife review, 100 m away
- Proposal for Tower construction under BOP/BIP Project at Sankosh Camp (SSB,… — more information requested, 150 m away
- Proposal for Tower construction under BOP/BIP Project at Kalikhola BOP Camp… — decision issued, 1.5 km away
- BOP Kalikhola — decision issued, 2.9 km away
- BOP Newland-1 — decision issued, 4.3 km away
- BOP Newland — decision issued, 6.1 km away
- BOP Raidak — decision issued, 10.1 km away
More from Mahesh Nair in Alipurduar
- Proposal for Tower construction under BOP/BIP Project at Santlabari… — more information requested
- Proposal for Tower construction under BOP/BIP Project at Bhutanghat… — decision issued
- Proposal for Tower construction under BOP/BIP Project at Kalikhola BOP Camp… — decision issued
- Proposal for Tower construction under BOP/BIP Project at Lepchaka Camp (53 BN) — decision issued
- Proposal for Tower construction under BOP/BIP Project at Buxadwar Camp (53rd BN) — under wildlife review
- Proposal for Tower construction under BOP/BIP Project at Santlabari Camp (53rd… — more information requested
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.