Quick answers
What is this project?
Proposal for Tower construction under BOP/BIP Project at Lepchaka Camp (53 BN) is a telecom project in Chunabhati, Kalchini, Alipurduar, West Bengal. The site covers 0 acres.
Who is building it?
The applicant is Mahesh Nair.
Has it been approved?
Yes. Its status is “Decision issued” (since 31 Aug 2024), as of 27 Nov 2026.
Where is it?
In Chunabhati, Kalchini, Alipurduar, West Bengal.
How big is it?
It has a stated cost of ₹1 crore and a site of 0 acres.
When was it filed?
The application was filed on 31 Aug 2024.
Project details
| Status | Decision issued |
|---|---|
| Status since | 31 Aug 2024 |
| Application filed | 31 Aug 2024 |
| Approval sought | Wildlife review |
| Application type | New project |
| Sector | Telecom |
| Applicant | Mahesh Nair |
| Land area | 200 m² |
| Project cost | ₹1 crore |
| Village / locality | Chunabhati |
| Taluk / tehsil | Kalchini |
| District | Alipurduar |
| State | West Bengal |
| Location from | Site boundary on record |
| Our reference | WID-WB-02477 |
In context
42 applications in Alipurduar since January 2022 are in the same category (Telecom): 5 approved, 8 filed or under review, and 23 withdrawn, lapsed or rejected. The approved ones took a median of 21 months from filing to approval. At 0 acres, this one is smaller than 100% of them.
26 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Chunabhati, Kalchini, Alipurduar, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- 4g Saturation Project in Uncovered Village Lepchaka Buxa Duar — lapsed, 200 m away
- 4g Saturation Project in Uncovered Village Lepchaka Buxa Duar — decision issued, 200 m away
- Border outpost security along the Indo Bhutan border Lepchakha, 53 BN SSB… — decision issued, 250 m away
- Border outpost security along the Indo Bhutan border Lepchakha, 53 BN SSB… — more information requested, 350 m away
- Border outpost security along the Indo Bhutan border Buxaduar, 53 BN SSB… — more information requested, 800 m away
- Border outpost security along the Indo Bhutan border Buxaduar, 53 BN SSB… — decision issued, 800 m away
- 4g Saturation Project in Uncovered Village Buxa Hill Forest — lapsed, 1000 m away
- 4g Saturation Project in Uncovered Village Buxa Hill Forest — decision issued, 1000 m away
More from Mahesh Nair in Alipurduar
- Proposal for Tower construction under BOP/BIP Project at Sankosh Camp_Outside… — more information requested
- Proposal for Tower construction under BOP/BIP Project at Sankosh Camp_Outside… — decision issued
- Proposal for Tower construction under BOP/BIP Project at Santlabari… — more information requested
- Proposal for Tower construction under BOP/BIP Project at Bhutanghat… — decision issued
- Proposal for Tower construction under BOP/BIP Project at Kalikhola BOP Camp… — decision issued
- Proposal for Tower construction under BOP/BIP Project at Buxadwar Camp (53rd BN) — under wildlife review
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.