What is Developing? Open the mapMap

LapsedPower · Darjiling, West Bengal

Rammam Hydroelectric Power Project Stage-III (3X40 MW)

Rammam Hydroelectric Power Project Stage-III (3X40 MW) is a lapsed power project in Karmi, Darjeeling Pulbazar, Darjiling, West Bengal. The site covers 13.3 acres. Its stated project cost is ₹13.8 crore. As of 27 Nov 2026, its status is “Lapsed” (since 29 Sept 2026).

See it on the live map All projects in Darjiling

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

StatusLapsed
Status since29 Sept 2026
Application filed5 Mar 2024
Approval soughtForest land use
Application typeNew project
SectorPower
ApplicantNTPC Limited (NTPC)
Land area13.3 acres (5.4 ha)
Forest land7.9 acres (3.2 ha)
Project cost₹13.8 crore
Village / localityKarmi
Taluk / tehsilDarjeeling Pulbazar
DistrictDarjiling
StateWest Bengal
Location fromSite boundary on record
Our referenceWID-WB-01966

Where it is

Karmi, Darjeeling Pulbazar, Darjiling, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from NTPC Limited (NTPC) in Darjiling

3 NTPC projects in Darjiling
All 129 NTPC projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.