Project details
| Status | More information requested |
|---|---|
| Status since | 7 Sept 2026 |
| Application filed | 18 Dec 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Water & irrigation |
| Applicant | Som Chowdhury |
| Land area | 100 m² |
| Forest land | 2,930 m² |
| Project cost | ₹2.7 crore |
| Village / locality | Nimna Tandu Forest |
| Taluk / tehsil | Mal |
| District | Jalpaiguri |
| State | West Bengal |
| Location from | Site boundary on record |
| Our reference | WID-WB-01990 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 18 Dec 2024 (this page) | More information requested | 0 acres | ₹2.7 crore |
| New project filed 13 Sept 2024 | More information requested | 0 acres | ₹2.7 crore |
In context
14 applications in Jalpaiguri since January 2022 are in the same category (Water & irrigation): 3 approved, 5 filed or under review, and 6 withdrawn, lapsed or rejected. At 0 acres, this one is smaller than 100% of them.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Nimna Tandu Forest, Mal, Jalpaiguri, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Jal Jeevan Misison (Jjm) Scheme for Gravity Based Water Supply Scheme for… — more information requested, 0 m away
- 4g Saturation Project in Uncovered Village Bichabhanga — forest land use approved, 50 m away
- Detailed Project Report of Proposed Sankosh-Teesta-Ganga (S-T-G) Link Project — more information requested, 5.9 km away
- Dakshin Saripakuri Sand Mine (MIN_JPG_10) — environmental approval granted, 6.6 km away
- Crown Forest Villa — more information requested, 9.8 km away
- Basusuba Sand Mine (MIN_JPG_25) — environmental approval granted, 11.7 km away
- Premganj Majhali Sand Mine (MIN_JPG_22) — environmental approval granted, 12.1 km away
- 4g Saturation Project in Uncovered Village Sologhoria — forest land use approved, 12.1 km away
More from Som Chowdhury in Jalpaiguri
- Jal Jeevan Misison (Jjm) Scheme for Gravity Based Water Supply Scheme for… — lapsed
- Jal Jeevan Misison(Jjm) Scheme for Gravity Based Water Supply Scheme for… — more information requested
- Jal Jeevan Misison (Jjm) Scheme for Gravity Based Water Supply Scheme for… — more information requested
- Jal Jeevan Misison (Jjm) Scheme for Gravity Based Water Supply Scheme for… — forest land use approved
- Jal Jeevan Misison(Jjm) Scheme for Gravity Based Water Supply Scheme for… — lapsed
- Jal Jeevan Misison(Jjm) Scheme for Gravity Based Water Supply Scheme for… — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.