Project details
| Status | More information requested |
|---|---|
| Status since | 16 Apr 2026 |
| Application filed | 4 Feb 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Water & irrigation |
| Applicant | Som Chowdhury |
| Land area | 400 m² |
| Forest land | 450 m² |
| Project cost | ₹1.1 crore |
| Village / locality | Apalchand Forest |
| Taluk / tehsil | Mal |
| District | Jalpaiguri |
| State | West Bengal |
| Location from | Site boundary on record |
| Our reference | WID-WB-02263 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 4 Feb 2025 (this page) | More information requested | 0.1 acres | ₹1.1 crore |
| New project filed 15 Feb 2024 | Lapsed | 65.6 acres | ₹1.1 crore |
In context
14 applications in Jalpaiguri since January 2022 are in the same category (Water & irrigation): 3 approved, 5 filed or under review, and 6 withdrawn, lapsed or rejected. At 0.1 acres, this one is smaller than 86% of them.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Apalchand Forest, Mal, Jalpaiguri, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Jal Jeevan Misison(Jjm) Scheme for Gravity Based Water Supply Scheme for… — lapsed, 450 m away
- Proposed river bed sand mining project over an area of 4.80 ha (11.86 Acres)… — cleared for impact study, 2.8 km away
- 4G Saturation Project in uncovered village Mechbasti — forest land use approved, 6.5 km away
- Jal Jeevan Misison (Jjm) Scheme for Gravity Based Water Supply Scheme for… — lapsed, 8.3 km away
- Detailed Project Report of Proposed Sankosh-Teesta-Ganga (S-T-G) Link Project — under wildlife review, 8.5 km away
- 4g Saturation Project in Uncovered Village Sologhoria — forest land use approved, 9 km away
- Intake Setup at Upstream of Teesta Barrage at Gajoldoba and Laying 2.356 Km… — more information requested, 9.9 km away
- Intake Setup at Upstream of Teesta Barrage at Gajoldoba and Laying 2.356 Km… — decision issued, 9.9 km away
More from Som Chowdhury in Jalpaiguri
- Jal Jeevan Misison (Jjm) Scheme for Gravity Based Water Supply Scheme for… — lapsed
- Jal Jeevan Misison (Jjm) Scheme for Gravity Based Water Supply Scheme for… — more information requested
- Jal Jeevan Misison (Jjm) Scheme for Gravity Based Water Supply Scheme for… — more information requested
- Jal Jeevan Misison (Jjm) Scheme for Gravity Based Water Supply Scheme for… — more information requested
- Jal Jeevan Misison (Jjm) Scheme for Gravity Based Water Supply Scheme for… — forest land use approved
- Jal Jeevan Misison(Jjm) Scheme for Gravity Based Water Supply Scheme for… — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.